The first time I attended a BIM coordination meeting with a team of mixed backgrounds, I counted eleven acronyms in the first five minutes. EIR, BEP, CDE, LOD, IFC, BCF, MIDP, AIM… A junior engineer next to me was frantically writing them down, and I could see in his face the same feeling I had had years earlier: “Everybody understands this except me.”
That feeling is the biggest barrier to entering the BIM world, and it is completely unnecessary. BIM vocabulary looks intimidating, but each term has a simple idea behind it. I have spent years as a CAD manager and software trainer explaining these words to new hires, and I know which ones create the most confusion. So I wrote the glossary I wish I had received on my first day.
This guide explains more than 120 BIM terms in plain language, from A to Z, with practical comments where beginners usually get lost. Bookmark it, share it with new colleagues, and come back whenever an unfamiliar acronym appears in a meeting.
How to Use This Glossary
- Terms are listed alphabetically, with a short practical explanation.
- Where a term has its own complete guide on this site, I mention it so you can go deeper.
- Acronyms are listed under their acronym (for example, BEP) and explained in full, because that is how you will meet them in real life.
- A few terms vary slightly between countries and standards. I point that out when it matters.
If you are completely new to the subject, I suggest you read What Is BIM? The Complete Guide to Building Information Modeling first, then return here.
Numbers
- 2D / 3D: two-dimensional (drawings) and three-dimensional (models) representations. In BIM, 2D drawings are usually generated from the 3D model.
- 4D, 5D, 6D, 7D: the BIM dimensions, which add time, cost, sustainability and operations to the 3D model. They are industry language, not formal standards. See BIM Dimensions Explained: 3D, 4D, 5D, 6D, and 7D.
A
- AEC: Architecture, Engineering and Construction. The industry that BIM serves. You will also see AECO, where the “O” stands for Operations.
- AIM (Asset Information Model): the information model that supports the operation and maintenance of an asset. It is typically built from the project information model at handover. See Asset Information Models (AIM): Creation and Management.
- AIR (Asset Information Requirements): the information an owner needs about an asset to operate and maintain it. It feeds the project requirements. See Asset Information Requirements (AIR): Complete Guide.
- Appointed party: a company or individual that provides information, works, goods or services under an appointment. In plain words, the supplier.
- Appointing party: the party that appoints others to provide services or information. In plain words, the client (or the party acting for the client).
- Asset: anything that has value to an organization: a building, a road, a bridge, a water network, a piece of equipment.
- As-built model: a model updated to reflect what was actually built, not what was designed. Differences between design and reality are always larger than people expect.
- Attribute: a piece of non-graphical data attached to an element, such as a fire rating or manufacturer. In many tools, attributes and parameters mean almost the same thing.
- Authoring tool: software used to create BIM models, as opposed to software used only to view or check them. Examples: Revit, Archicad, Tekla Structures. See Best BIM Software: A Complete Comparison Guide.
B
- BCF (BIM Collaboration Format): an open format used to exchange issues and comments between different BIM software. It carries the issue description, the viewpoint and the element references, but not the model itself. See BIM Collaboration Format (BCF): The Complete Guide.
- BEP (BIM Execution Plan): the document that explains how the delivery team will manage information on a project: roles, standards, software, schedules, quality checks. Under ISO 19650, there are a pre-appointment BEP (an offer) and a post-appointment BEP (the agreed plan). See BIM Execution Plan (BEP): How to Create and Implement One.
- BIM (Building Information Modeling): the use of a shared digital representation of an asset to support design, construction and operation. Sometimes read as Building Information Management.
- BIM Coordinator: the person who combines discipline models, runs clash detection and manages coordination issues. See BIM Roles and Responsibilities: Manager, Coordinator, Modeler, and Information Manager.
- BIM Manager: the person responsible for BIM strategy, standards and implementation, at office level or project level.
- BIM Modeler: the person who builds and maintains models in an authoring tool.
- BIM Protocol: a contractual document, often an addendum, that sets out the legal obligations relating to BIM on a project, such as responsibilities and the use of models. See BIM Protocol and Contract Addendum Template.
- BIM Uses: the specific purposes for which BIM is applied on a project, such as design coordination, quantity takeoff or energy analysis. See BIM Uses Explained: What Is BIM Actually Used For?.
- bSDD (buildingSMART Data Dictionary): an online service that hosts classifications, properties and definitions in a structured way, so that software and people can use the same vocabulary. See buildingSMART Data Dictionary (bSDD) Explained.
- buildingSMART: the international organization that develops and maintains openBIM standards such as IFC, BCF, IDS and bSDD.
C
- CAD (Computer-Aided Design): software for creating drawings, traditionally lines and shapes without embedded data. See BIM vs. CAD: Understanding the Key Differences.
- CAFM (Computer-Aided Facility Management): software used by facility managers to manage spaces, assets and maintenance. BIM data is often imported into it.
- Category: in authoring tools such as Revit, the broad classification of an element (Walls, Doors, Ducts). It determines how the element behaves and is displayed.
- CDE (Common Data Environment): the agreed source of information for a project, where information is collected, managed and shared through a managed process. It is not just a shared folder: it applies status, versioning, naming and permissions. See Common Data Environment (CDE): The Complete Guide.
- Classification: a system for organizing elements into standard categories, each with a code. Examples: Uniclass, OmniClass, Uniformat, MasterFormat. See BIM Classification Systems Compared: Uniclass, OmniClass, Uniformat, and MasterFormat.
- Clash: a conflict between two or more elements. See hard clash, soft clash and workflow clash below.
- Clash detection: the automated process of finding clashes between models. See BIM Clash Detection: The Complete Guide.
- Clash matrix: a table that defines which disciplines or systems are tested against which, with tolerances. See How to Create a BIM Clash Detection Matrix.
- Clearance: the free space required around an element for maintenance, access or safety. Violating a clearance is a soft clash.
- COBie (Construction-Operations Building information exchange): a standardized way of structuring asset data (spaces, equipment, systems, documents) for handover to the owner. See COBie Explained: The Complete Guide to BIM Asset Data Handover.
- Common coordinate system: the single coordinate reference that all discipline models share so that they align. See BIM Georeferencing: Coordinate Systems and Model Positioning.
- Constraint: a rule in a parametric model that keeps relationships, such as a wall staying attached to a level.
- Coordination: the process of combining and checking discipline models to resolve conflicts and align design decisions. See BIM Coordination: The Complete Guide.
D
- Data drop: a formal point in a project when defined information must be delivered (used mainly in UK practice). Today often called an information delivery milestone.
- Data template: a structured set of properties describing a type of object, designed so that information can be defined once and reused. See ISO 23387: BIM Data Templates Explained.
- Detail level: informal term for how much graphical detail an element has. Often confused with LOD. See BIM Levels of Development (LOD) Explained.
- Digital twin: a digital representation of an asset that is connected to real-time data (such as sensors), so that it reflects the current state. A BIM model is often the starting point. See BIM vs. Digital Twins: Differences, Connections, and Applications.
- Discipline: a professional area of design or construction: architecture, structure, MEP, civil, landscape and so on. Each normally produces its own model.
- Document: in ISO 19650 language, information in a document form (drawing, specification, report), as opposed to a model or a data set.
- Dynamo: a visual programming tool used to automate tasks in Revit and other software. See Dynamo for BIM Automation: The Complete Guide.
- DWG: the native file format of AutoCAD. It remains widely used for 2D exchange in BIM projects.
E
- Element: the basic building block of a model: a single wall, column, duct, door.
- EIR (Exchange Information Requirements): the document in which the appointing party states what information must be delivered, when, in which format and to which level. See Exchange Information Requirements (EIR): Complete Guide. Terminology note: older documents used “Employer’s Information Requirements”, with the same abbreviation.
- Export / Import: moving a model or data out of, or into, another software. See How to Export and Import IFC Models Correctly.
- Extension: an add-on that adds new tools to a software, usually called a plugin or add-in. See Best Revit Plugins and Add-Ins.
F
- Family (Revit): a group of elements with a common set of parameters and a related graphical representation. In Revit, a family is the template from which types and instances are created. See BIM Objects, Families, and Parameters Explained.
- Federated model: a combination of separate models (for example, architecture, structure and MEP) linked together for coordination, without merging their authorship. See BIM Models vs. Federated Models: What Is the Difference?.
- Federation strategy: the plan describing how a project’s information will be divided into separate models and combined again.
- File naming convention: a set of rules that defines how files are named so they can be identified, sorted and controlled. See BIM File Naming Conventions and ISO 19650.
- FM (Facility Management): the profession that manages buildings and their services during operation.
G
- Generative design: the use of algorithms to generate and evaluate many design options against defined criteria. See Generative Design in BIM: Methods, Tools, and Applications.
- Geometry: the shape, size and position of an element. It is only one half of a BIM element; the other half is information.
- GIS (Geographic Information System): a system for managing and analyzing location-based data. It is increasingly connected with BIM, especially for infrastructure and site context. See BIM and GIS Integration: The Complete Guide.
- GlobalId / GUID: a unique identifier assigned to each element, especially in IFC, so that it can be tracked across versions and software.
- Grid: the reference lines that define the structural and planning layout of a building. Grids and levels must be identical across discipline models.
H
- Hard clash: two elements that physically occupy the same space, such as a pipe passing through a beam.
- Host: an element that supports another element. A wall hosts a door; a floor hosts a fixture.
- HVAC: Heating, Ventilation and Air Conditioning. One of the main systems in MEP.
I
- IDS (Information Delivery Specification): a buildingSMART standard that lets you define, in a machine-readable way, what information a model must contain, so it can be automatically checked. See Information Delivery Specification (IDS): The Complete Guide.
- IFC (Industry Foundation Classes): an open, vendor-neutral data schema used to exchange BIM models between different software. It is standardized as ISO 16739. See IFC Files Explained: Structure, Classes, and Properties and IFC 2×3 vs. IFC4 vs. IFC4.3: Key Differences.
- IfcOpenShell: an open-source software library used to read, write and process IFC files, often through Python. See IFC Automation Using Python and IfcOpenShell.
- Information container: in ISO 19650, a named, persistent set of information retrievable from a file, system or application storage: a model, a document, a schedule.
- Information delivery milestone: a point in the project when information is formally delivered and checked.
- Information manager: the role responsible for managing information workflows and the CDE under ISO 19650.
- Information model: the set of structured and unstructured information containers for an asset or project. The PIM and the AIM are information models.
- Information requirements: the general term for the statements of what information is needed: OIR, AIR, PIR and EIR. See ISO 19650 Information Requirements Explained: OIR, AIR, PIR, and EIR.
- Instance: a single placed occurrence of a type in the model. If you place ten identical doors, you have ten instances of one type.
- Interoperability: the ability of different software to exchange and use information without loss. See BIM Interoperability Problems and How to Solve Them.
- ISO 19650: the international standard series for organization and digitization of information about buildings and civil engineering works, including BIM. It defines the processes, roles and the CDE. See ISO 19650 Explained: A Complete Guide for BIM Professionals.
- ISO 16739: the ISO standard that defines IFC. See ISO 16739 and the IFC Standard Explained.
- ISO 7817-1: the ISO standard on level of information need, covering concepts and principles. See ISO 7817-1: Level of Information Need Explained.
- Issue: a recorded problem, question or decision needing action, usually found during coordination and tracked until resolved. See BIM Issue Tracking and Resolution Using BCF.
L
- Level (or Storey): a horizontal reference plane that defines the height of a floor. In authoring tools, many elements are tied to levels.
- Level of Detail: the amount of graphical detail in a model element. See Level of Information Need vs. LOD vs. LOI: Key Differences.
- Level of Development (LOD): a framework describing how far an element’s geometry and information have been developed, typically LOD 100 to LOD 500 (with 350 as an intermediate level in the BIMForum specification). See BIM Levels of Development (LOD) Explained.
- Level of Information (LOI): the amount of non-graphical information in an element.
- Level of Information Need (LOIN): a framework that defines how much geometric, alphanumeric and documentation information is needed for a specific purpose and milestone. It is the modern approach in European and ISO standards. See ISO 7817-1: Level of Information Need Explained.
- Link (linked model): a model referenced inside another one, without being merged. Linked models are updated when the source changes.
- Lead appointed party: the party that coordinates the information delivery of a delivery team and interfaces with the appointing party.
M
- Maturity levels: the older UK classification (Level 0 to Level 3) describing how mature BIM collaboration is. Largely replaced by ISO 19650 terminology. See BIM Maturity Levels (Level 0 to 3) and the Shift to ISO 19650.
- MEP: Mechanical, Electrical and Plumbing. The building services disciplines. See MEP BIM Modeling: The Complete Guide.
- Metadata: data about data, such as author, date, status or revision of a file. See BIM Metadata, Attributes, and Property Sets Explained.
- MIDP (Master Information Delivery Plan): the plan that brings together all task information delivery plans and defines what is delivered, by whom and when. See Master Information Delivery Plan (MIDP): Complete Guide.
- Model: a digital representation of an asset or part of it. In BIM, a model contains geometry and information.
- Model checking: the process of verifying a model against rules for geometry, information and standards. See BIM Model Checking: Geometric and Information Validation.
- Model View Definition (MVD): a subset of the IFC schema defined for a specific exchange purpose. See Model View Definitions (MVD): Understanding IFC Exchange Requirements.
- Modeling standard: a set of rules describing how elements must be modeled, so that models are consistent between users and teams.
N
- Native file: a file in the original format of its software (for example .RVT for Revit, .PLN or .PLA for Archicad). Native files preserve all features but can only be opened by that software.
- Navisworks: Autodesk software widely used for model federation, clash detection and 4D simulation. See Autodesk Navisworks: The Complete BIM Coordination Guide.
- Naming convention: the agreed rules for naming files, elements, views and parameters.
O
- Object: a BIM element that carries geometry and information. In BIM language, objects are what you place in a model, as opposed to lines you draw.
- OIR (Organizational Information Requirements): the information an organization needs from its assets to achieve its business objectives. See Organizational Information Requirements (OIR): Complete Guide.
- OmniClass: a classification system used mostly in North America.
- openBIM: an approach to BIM based on open standards and vendor-neutral workflows, such as IFC and BCF. See openBIM Explained: Principles, Standards, and Benefits.
- Origin: the reference point (0,0,0) of a model’s coordinate system. Misaligned origins are a leading cause of misaligned models.
P
- Parameter: a named piece of data attached to an element, such as Height, Material or Fire Rating. A parameter may be type-based (shared by all instances of a type) or instance-based (unique to each placed element).
- Parametric modeling: modeling in which elements are controlled by parameters and relationships, so changes propagate automatically.
- PIM (Project Information Model): the information model developed during design and construction. See Project Information Models (PIM) vs. Asset Information Models (AIM).
- PIR (Project Information Requirements): the information needed at project level to answer the asset owner’s questions during delivery. See Project Information Requirements (PIR): Complete Guide.
- Plugin: an add-on that extends software functionality.
- Point cloud: a large set of 3D points, usually produced by laser scanning or photogrammetry, representing the surface of existing conditions. See BIM and Reality Capture: Laser Scanning, Photogrammetry, and Point Clouds.
- Project base point / survey point: reference points in Revit that define the model’s position relative to the project and to real-world coordinates.
- Property set (Pset): in IFC, a named group of properties attached to an element, such as the standard Pset_WallCommon. See BIM Metadata, Attributes, and Property Sets Explained.
- Purge: to remove unused elements (families, types, styles) from a model to reduce file size and clutter.
Q
- QA (Quality Assurance): the planned processes that aim to prevent errors. In BIM: standards, templates, training, procedures.
- QC (Quality Control): the checking activities that detect errors in outputs: audits, reviews, validations. See BIM Quality Assurance vs. Quality Control: Processes and Checklists.
- Quantity takeoff (QTO): the process of extracting quantities (areas, volumes, lengths, counts) from a model. See BIM Quantity Takeoff: Methods, Tools, and Best Practices.
R
- Reality capture: the collection of data about existing conditions with scanners, drones or cameras.
- Responsibility matrix: a table defining who is responsible for producing which information, at which level, and when. See How to Create a BIM Responsibility Matrix.
- Revit: Autodesk’s BIM authoring software, widely used for architecture, structure and MEP. See Autodesk Revit: The Complete Guide for BIM Professionals.
- RFI (Request for Information): a formal question sent during construction to clarify design information. Good BIM coordination reduces them.
- RVT: the native file format of Revit.
S
- Scan-to-BIM: the process of creating a BIM model from a point cloud of an existing building. See Scan-to-BIM: Converting Point Clouds into Intelligent Models.
- Schedule: in BIM, a table generated from model data, such as a door schedule or room schedule.
- Shared coordinates: a coordinate setup that allows different models to share the same position in space, often tied to a real-world coordinate system.
- Sheet: a drawing sheet composed of views generated from the model.
- Soft clash: a violation of a required clearance or tolerance without physical overlap.
- Spatial coordination: the process of ensuring that elements from different disciplines fit in the space without conflict.
- Status code: a code describing the suitability of information in the CDE, for example “for coordination” or “for construction”.
- Suitability: in the UK national annex to ISO 19650, a code that states what information may be used for (coordination, information, construction and so on).
T
- Task team: a group of individuals assigned to a specific scope of information production within a delivery team.
- Template (project template): a pre-configured project file containing standard settings, views, families and parameters. Starting every project from the same template is one of the most effective quality measures. See How to Build a BIM Project Template.
- TIDP (Task Information Delivery Plan): the plan of a single task team, listing what it will deliver and when. TIDPs are combined into the MIDP. See Task Information Delivery Plan (TIDP): Complete Guide.
- Tolerance: the acceptable distance used in clash detection to decide whether an interference is reported.
- Type: in authoring tools, a specific configuration of a family or category, such as “Door 900 x 2100, fire-rated”. All instances of that type share its type parameters.
U
- Uniclass: a classification system used in the UK and in international projects, covering elements, systems, products and more.
- Uniformat: a classification system organizing building information by functional elements, popular for early-stage cost planning.
- Unit: the measurement system used in a model (metric or imperial). Units must be defined consistently across discipline models.
V
- Version control: the tracking of successive revisions of a file, so you can identify the latest and recover older ones.
- View: a representation of the model, such as a plan, section, 3D view or schedule. In BIM, views are windows on the same data, not separate drawings.
- Viewer: software that opens models for review but not for editing. See Best BIM Viewers: Opening IFC, RVT, and NWD Files.
- Volume strategy: a plan describing how a project’s model is divided into volumes (zones or parts) so that teams can work in parallel.
W
- Workset: in Revit, a collection of elements within a shared model that allows multiple users to work at the same time on different parts.
- Workflow clash: a scheduling or sequencing conflict, such as two trades needing the same space at the same time.
- WIP (Work in Progress): the first state of information in the CDE, private to the author or task team while it is being developed.
Understanding the Four CDE States
Because the CDE states appear in so many definitions, here is a visual reminder of how information flows in a typical ISO 19650 workflow.

- Work in progress: the author’s private working area.
- Shared: information checked and available for coordination between teams.
- Published: information authorized for use (for example, for construction or for the client).
- Archive: the historical record of everything that was shared and published.
The Terms Beginners Confuse Most
Over the years, I have noticed a handful of confusions that appear in nearly every training course.
| Often confused | The practical difference |
|---|---|
| BIM vs. 3D model | A 3D model shows shape. BIM adds structured information and a managed process. |
| BIM vs. Revit | Revit is software. BIM is a methodology. |
| Federated model vs. merged model | A federated model links separate models and keeps ownership separate. A merged model combines them into one file and loses clear ownership. |
| LOD vs. LOI vs. LOIN | LOD bundles detail and information. LOI is information only. LOIN defines what is needed for a purpose. |
| Type vs. instance | A type is a definition. An instance is one placed occurrence of it. |
| EIR vs. BEP | The EIR says what the client needs. The BEP says how the delivery team will provide it. |
| PIM vs. AIM | The PIM is the model during project delivery. The AIM is the model during operation. |
| IFC vs. BCF | IFC carries model data. BCF carries issues about the model. |
| QA vs. QC | QA prevents errors through process. QC finds errors in outputs. |
| Clash vs. issue | A clash is a detected conflict. An issue is a tracked item that may or may not come from a clash. |
How to Learn This Vocabulary Faster
When I train new BIM staff, I do not ask them to memorize a list. I use this simple approach, and it works.
- Start with the process, not the acronyms. Understand the flow: requirements, plan, model, coordinate, check, deliver, operate.
- Attach each term to a document or an action. The EIR is a document you read. The BEP is a document you write. A clash is something you resolve.
- Use them in real situations. Sit in a coordination meeting and note the vocabulary.
- Learn the standard names. If you work internationally, learn the ISO 19650 terms first, then the local ones.
- Keep a personal glossary of terms used in your own company, since each office has its own jargon.
Frequently Asked Questions
What are the most important BIM terms for beginners?
Start with BIM, model, element, parameter, LOD, CDE, IFC, BEP, EIR and clash detection. These cover most conversations in an ordinary project.
What is the difference between BIM and digital twin?
BIM is a methodology and set of models used mainly during design, construction and handover. A digital twin is connected to live data from the real asset. A good BIM model can be the starting point for a digital twin.
Is LOD still used?
Yes, widely, especially in North America and in contracts that refer to the AIA or BIMForum frameworks. European and ISO standards promote the Level of Information Need as a more precise approach.
What does “openBIM” mean?
It is a way of working based on open standards (such as IFC, BCF and IDS) that allows different software and vendors to collaborate on the same project.
Do I need to know all these terms to work in BIM?
No. Learn the ones that matter for your role and your projects, and use this glossary as a reference for the rest.
Final Thoughts
The vocabulary of BIM is not there to confuse you. It exists because a project involves dozens of companies and hundreds of people, and everyone needs precise words to avoid misunderstandings that cost real money. When two people say “the model” and mean different things, the cost can be enormous.
My advice: do not be afraid to ask “What do you mean exactly by that?” in a meeting. In thirty years, I have never seen anybody criticized for asking that question, and I have seen many projects saved by it.
Where to go next: once you are comfortable with the vocabulary, read What Is BIM? The Complete Guide to Building Information Modeling, then BIM Levels of Development (LOD) Explained for the topic that confuses beginners the most.