ISO 16739 and the IFC Standard Explained

ISO 16739 and the IFC Standard Explained

Every CAD manager of my generation has a story about file formats. Mine involves a Friday afternoon, a client in a different country and a drawing that opened with every layer renamed, every text style replaced and one entire building floor missing. We had exported to the “universal” exchange format of the day, and what arrived on the other side was a puzzle. That experience, repeated in a thousand offices, is why I have a certain tenderness for IFC. It is the first exchange format I know that was designed not to move drawings between programs, but to move the meaning of a building.

IFC is also one of the most misunderstood standards in our field. People call it a “file format”, which it is, and a “schema”, which it is, and an “ISO standard”, which it also is, and then they get confused about which of these they are talking about when something goes wrong with an export. The ISO side of the story, ISO 16739, is the part that tends to be skipped, because it sounds like paperwork. It is not. It explains why IFC is trusted for public procurement, why there are different editions, and what you can and cannot promise when you write “deliver in IFC” in a contract.

This guide explains the ISO standard behind IFC: what ISO 16739-1 contains, how it relates to the IFC versions you see in software, how the schema is organized, what changed with infrastructure, and how to specify IFC properly in a project. The structure of an IFC file and the practical exporting workflow have their own guides, to which I will point you.


The Short Answer

IFC (Industry Foundation Classes) is an open, vendor-neutral data schema for describing buildings and infrastructure, developed and maintained by buildingSMART International. It is published by ISO as ISO 16739-1, titled Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries, Part 1: Data schema.

The current edition is ISO 16739-1:2024, published in March 2024. It standardizes the IFC 4.3 schema (the ADD2 revision), and for the first time covers infrastructure facilities: bridges, roads, railways, waterways and port facilities, in addition to buildings.

In one sentence:

IFC is the shared language that lets different BIM software describe the same building in the same words. ISO 16739 is the official, citable edition of that language.


What ISO 16739-1 Contains

The published scope describes it as an open international standard for information used in BIM that is exchanged and shared among software applications used by the participants of the construction and facility management sector. According to the scope, the document comprises:

  • the publication of a data schema;
  • its documentation;
  • the property and quantity set definitions;
  • the mechanism of an exchange file format structure.

The scope also lists the kind of information deliveries that the schema is meant to support across the life cycle: from conception of need and outline feasibility, through conceptual and coordinated design, procurement, production information and construction, to operation and maintenance. And it lists the disciplines and uses involved: architecture and civil engineering design, services and utilities engineering, structural engineering, procurement, construction planning, facility management, project management, client requirement management and authority approvals.

Finally, it describes the BIM exchange format definitions that the schema provides, covering things such as project structure, physical components, spatial components, analysis items, processes, resources, controls, actors and context definition.

Information Deliveries and Model View Definitions

Two further ideas in the scope are worth understanding because they affect your contracts.

  1. Information deliveries can be described according to ISO 29481, the standard series for Information Delivery Manuals (IDM). An IDM describes a business process and the information that has to be exchanged within it.
  2. Implementation levels can be defined as Model View Definitions (MVD). An MVD identifies which subset of the IFC schema is required to be implemented by software for a particular information delivery. Software that wants to be certified has to state which MVD it conforms to.

In plain words: the schema is large (it describes far more than any single exchange needs), so MVDs define the portion that matters for a given exchange, such as “a coordination model” or “a reference model”. See Model View Definitions (MVD): Understanding IFC Exchange Requirements.


IFC and ISO: Who Does What

The relationship between the open specification and the ISO standard often confuses people, so let me separate the roles.

OrganizationRole
buildingSMART InternationalDevelops and maintains the IFC schema through working groups, public reviews and formal ratification
ISO (ISO/TC 59/SC 13)Publishes the IFC schema as an international standard, ISO 16739-1
Software vendorsImplement import and export in their products, often certified against defined MVDs
Users and clientsSpecify IFC versions and views in their requirements

The open specification and the ISO edition correspond, but not on the same day. buildingSMART publishes a version, and ISO publishes an edition based on a given revision some time later.

How ISO Editions Map to IFC Versions

IFC versions and their ISO editions

IFC versionISO editionNotes
IFC 2×3Not the basis of the current ISO editionWidely used for coordination exchange in practice, especially through its coordination view
IFC4ISO 16739:2013A major update with richer geometry and property definitions
IFC4 ADD2ISO 16739-1:2018The 2018 edition, with the “Part 1” title
IFC 4.3 ADD2ISO 16739-1:2024Adds infrastructure and replaces the 2018 edition

This table explains a frequent source of confusion. When a contract says “IFC in accordance with ISO 16739”, it does not say which version. The 2013, 2018 and 2024 editions describe different schemas. Always state the exact IFC version and the model view you require. For a detailed comparison, read IFC 2×3 vs. IFC4 vs. IFC4.3: Key Differences.


A Short History of IFC

Understanding where IFC comes from makes it easier to understand why it looks the way it does.

  • 1994: A group of companies, formed around an initiative by Autodesk, began developing a common set of object classes for integrated applications. Twelve US companies joined the original consortium.
  • 1995 and after: The group opened to all interested parties, as the Industry Alliance for Interoperability, later renamed the International Alliance for Interoperability (IAI) when it became international.
  • 1996 to 1997: The first version, IFC 1.0, was announced in 1996 and published in its final form in January 1997. It had a deliberately limited scope.
  • Late 1990s and early 2000s: Successive releases (1.5, 2.0 and the “2x” family) extended the model. IFC 2×3, released in the mid-2000s, became the first version to see wide commercial implementation, and it remains in use today.
  • Mid-2000s: The organization was renamed buildingSMART, now buildingSMART International.
  • 2013: IFC4 was published and registered as ISO 16739:2013.
  • 2018: ISO 16739-1:2018 was published, based on IFC4 with its second addendum.
  • 2024: ISO 16739-1:2024 was published, based on IFC 4.3 ADD2, adding infrastructure.

For the wider story of how this fits into the history of BIM, see The History and Evolution of BIM.


How the IFC Schema Is Defined

You do not need to read the schema to use IFC, but understanding its logic helps you diagnose problems.

The Language: EXPRESS

The IFC schema is formally defined in EXPRESS, a data modeling language from the ISO 10303 (STEP) family of standards. EXPRESS describes entities (classes of things), their attributes and the rules that apply to them. Derived forms, such as an XML schema, are generated from the EXPRESS definition.

This heritage matters because IFC inherited its way of thinking from product data exchange in manufacturing. The goal was always an object-based description with relationships, not a bag of lines.

The Layers

The schema is organized conceptually in layers, from foundational concepts up to discipline-specific ones.

LayerContent (in simple terms)
ResourceBasic building blocks: geometry, units, materials, properties, measures, actors
CoreThe fundamental structure: objects, types, relationships, property definitions, products, processes, controls
Interoperability / sharedElements and services shared by several disciplines: walls, doors, spaces, building services components
DomainDiscipline-specific concepts: architecture, structural elements, building services, infrastructure domains

A reliable principle of this layering is that higher layers may refer to lower ones, but not the reverse. It keeps the model coherent and extensible.

Scale

The IFC schema is large. Independent summaries of the 4.3 edition describe well over a thousand entity types and thousands of properties grouped in hundreds of property sets. The point is not to memorize numbers. It is to appreciate that IFC is a comprehensive vocabulary, and no single export uses all of it.


What an IFC Model Looks Like Inside

Here, briefly, is how IFC describes a building. The dedicated guide, IFC Files Explained: Structure, Classes, and Properties, goes deeper; this section gives you the mental model.

How an IFC model is organized

A Spatial Tree

Every model has a project, which contains a site, which contains buildings, which contain storeys. Elements such as walls, doors and slabs are placed within this spatial structure through relationships. In IFC, relationships are objects too (for example IfcRelAggregates and IfcRelContainedInSpatialStructure).

Objects, Types and Occurrences

Physical things are represented as objects with classes such as IfcWall, IfcDoor or IfcBeam. A shared definition (a type, such as IfcDoorType) can be linked to many occurrences through a relationship (IfcRelDefinesByType), mirroring the family-type-instance logic of authoring tools. See BIM Objects, Families, and Parameters Explained.

Properties and Quantities

Information is attached through property sets and quantity sets. The standard defines many, with names beginning Pset_ and Qto_. For example, the common property set for walls includes properties such as fire rating, whether the wall is external and whether it is load-bearing. Projects can also define custom property sets. See BIM Metadata, Attributes, and Property Sets Explained.

Identity

Every “rooted” object carries a GlobalId: a 128-bit unique identifier, written as a 22-character string. It is how an element can be tracked across versions, models and issue systems (including BCF).

A Tiny Illustration

Here is a simplified, illustrative fragment of an IFC file in the text-based exchange format. Real files are far longer and the details vary by software.

#1=IFCPROJECT('0YvctVUKr0kugbFTf53O9L',#2,'Demo Project',$,$,$,$,(#3),#4);
#10=IFCWALL('3cUkl32yn9qRSPvBJVyWYp',#2,'Wall A',$,$,#11,#12,$,.STANDARD.);

Each line is an instance of an entity with its attributes in order. The first has a unique GlobalId, a name and a link to units and contexts. The second is a wall with its own GlobalId, a name, a placement, a representation and a predefined type. The $ symbol means “no value”. You will rarely read IFC like this, but seeing it once demystifies the format.


File Formats and Encodings

The ISO standard includes the mechanism of an exchange file format structure. In practice, IFC data can be encoded in several ways.

FormatExtensionNotes
STEP physical file (IFC-SPF).ifcA text file following ISO 10303-21. The most widely used
IFC XML.ifcXMLAn XML encoding, more verbose
Compressed.ifcZIPA zipped version of one of the above
Other serializationsVariousAdditional encodings, such as JSON-based ones, exist or are in development

When a project says “deliver IFC”, it normally means the .ifc STEP file. State it explicitly, along with the schema version (for example IFC4 or IFC 4.3) because the same extension covers several schema versions.


What Changed With IFC 4.3 and ISO 16739-1:2024

The 2024 edition is the first ISO edition to cover infrastructure. Its scope statement says it now includes information required for bridges, roads, railways, waterways and port facilities.

Key Additions

  • Linear referencing and alignments. Infrastructure is positioned along alignments (horizontal and vertical geometry along a route). IFC 4.3 introduces IfcAlignment and related concepts, which are essential for roads and railways.
  • Infrastructure domains. New or extended concepts for roads, railways, bridges, waterways and ports.
  • Georeferencing. Stronger support for placing models in real-world coordinate systems, using concepts such as map conversions and projected coordinate reference systems. This matters enormously when BIM meets GIS. See BIM Georeferencing: Coordinate Systems and Model Positioning.
  • Consolidation and clean-up of earlier material.

For the infrastructure story in detail, read IFC 4.3 for Infrastructure: Concepts, Capabilities, and Applications and Infrastructure BIM: The Complete Guide.

What It Means for Practice

  • If you work on buildings, IFC4 and IFC 2×3 remain common, and software support for IFC 4.3 is progressing at different speeds depending on the tool. Check what your software and your partners support.
  • If you work on infrastructure, IFC 4.3 is the reference. Prior versions lacked the necessary concepts.
  • If your contract says “latest IFC”, rewrite it. State the version.

Model View Definitions, Certification and Validation

Model View Definitions in Practice

For a given exchange, software and projects rely on an agreed view of the schema. Some well-known examples:

  • IFC 2×3 Coordination View 2.0: the long-time workhorse for design coordination in IFC 2×3.
  • IFC4 Reference View: a view for reference models, where geometry is meant to be read and not edited.
  • IFC4 Design Transfer View: a view intended to support exchange where the receiving party may modify and reuse the data.

State the version and the view in the EIR. A phrase such as “IFC4 Reference View” is a specification. “IFC” is not.

Software Certification

buildingSMART runs software certification programs, in which software vendors demonstrate that their import or export conforms to a given MVD. Certification does not guarantee that every export from that software will be perfect, but it shows that the implementation passes defined tests. Check the vendors’ certification status for the views you need.

Validation of Files

An IFC file can be tested for schema conformance and for certain rules using validation services and checkers. A file that passes validation is syntactically and structurally correct. It may still lack the properties you needed. That is the difference between validity and fitness for purpose. See How to Validate IFC Models for Data Quality and Compliance and Information Delivery Specification (IDS): The Complete Guide.


IFC in the Standards Landscape

IFC is one layer of a larger system.

QuestionStandard or tool
How is information managed over the life cycle?ISO 19650 series
How much information is needed?ISO 7817-1
How do models travel between software?IFC (ISO 16739-1)
Which part of IFC is used for an exchange?MVD, described with IDM (ISO 29481)
How are issues exchanged?BCF
How are requirements checked automatically?IDS
What do properties mean?bSDD, ISO 23386, ISO 23387

See BIM Standards: The Complete International Guide and openBIM Explained: Principles, Standards, and Benefits.


How to Specify IFC in a Project

This is where the ISO knowledge pays off. A good IFC requirement in an EIR is specific. Here is the checklist I use.

ItemExample of a precise statement
Schema versionIFC4 (ISO 16739-1:2018) or IFC 4.3 (ISO 16739-1:2024)
Model viewReference View or Design Transfer View, as relevant
File encoding.ifc (STEP physical file)
PurposeCoordination reference, quantity takeoff, handover
ContentThe classes, properties and classification codes required, per purpose and milestone (see LOIN)
Property setsStandard Pset_ properties where available; custom sets defined in a project document
CoordinatesOrigin, units, georeferencing method
IdentificationGlobalId stability between exports, naming of files and spatial structure
ValidationSchema validation and rule checking, with the tools to be used
DeliveryThrough the CDE, with status and revision

Do not forget stability of identifiers: if GlobalIds change every time a model is re-exported, issue tracking and comparison between versions become painful. Ask that the authoring tool preserves identifiers across exports, and test it. See BIM Model Version Comparison and Change Detection.


Common Problems With IFC (and What Causes Them)

IFC is a standard, but exports are translations. Most problems come from the translation, not from the standard.

ProblemTypical causeRemedy
Missing propertiesExport mapping not configured; properties not mapped to property setsConfigure and test property mapping; define the required properties in the EIR
Wrong element typesElements modeled in the wrong category, then mapped to the wrong IFC classFix modeling categories; review the class mapping
Geometry differencesComplex geometry simplified or tessellated; different representation choicesChoose appropriate export settings; test with the receiver’s software
Models do not alignCoordinates, units or georeferencing not agreedAgree and test the coordinate setup
Huge filesToo much detail, duplicated geometryLimit detail by purpose; split by discipline or zone
Lost materials or classificationsNot exported or not mappedInclude in the export mapping and verify
Changing GlobalIdsExport settings or workflow that regenerates identifiersPreserve identifiers; test round trips
Version mismatchSender and receiver using different IFC versionsState the version; test early

The golden rule of IFC projects: test early, with real data, in both directions. See How to Export and Import IFC Models Correctly and BIM Interoperability Problems and How to Solve Them.


What IFC Is Not

To avoid disappointment, remember what IFC does not do.

  • It is not a modeling tool. It is a format and a schema.
  • It is not lossless between native tools. A round trip from one authoring tool to IFC and back will not reproduce the original model.
  • It is not a guarantee of data quality. A valid file can be empty of the information you need.
  • It is not a replacement for native formats in every workflow. Closed BIM workflows within one vendor’s tools are still efficient for authoring. See openBIM vs. Closed BIM: Pros, Cons, and When to Use Each.
  • It is not frozen. The schema continues to evolve.
  • It is not only for geometry. Its value lies as much in structure, identity and properties as in shapes.

Why IFC Matters for the Future of BIM

IFC underpins much of the movement toward open, machine-checkable, vendor-neutral BIM.


Frequently Asked Questions

What is ISO 16739?

The international standard that publishes the IFC data schema: Industry Foundation Classes for data sharing in the construction and facility management industries. The current edition is ISO 16739-1:2024.

Is IFC an ISO standard?

Yes. IFC is developed by buildingSMART International and published by ISO as ISO 16739-1.

What is the difference between IFC and ISO 16739?

IFC is the schema and file format. ISO 16739-1 is the ISO edition that standardizes a specific version of the IFC schema.

Which IFC version does ISO 16739-1:2024 cover?

IFC 4.3, in its ADD2 revision, which adds infrastructure.

What did ISO 16739-1:2024 replace?

It replaced ISO 16739-1:2018, which was based on IFC4.

Does IFC support infrastructure?

Yes, from IFC 4.3: roads, railways, bridges, waterways and ports, using concepts such as alignments.

Is IFC 2×3 still used?

Yes, widely, especially for coordination exchange. But it lacks some capabilities of later versions and does not cover infrastructure.

What is an MVD?

A Model View Definition identifies the subset of the IFC schema that must be implemented for a given exchange. Software is certified against specific MVDs.

What is a GlobalId?

A unique identifier (128-bit, written as 22 characters) carried by IFC objects, used to track them across models and versions.

Which IFC version should I request?

It depends on your project and partners’ software. Choose a version and a model view that your tools support, test the exchange early and write it explicitly in the EIR.

Does an IFC file guarantee my required data is present?

No. A valid file may still lack required properties. Specify the information need and check it, for instance with IDS.


Final Thoughts

When I think of that Friday afternoon with the missing floor, what strikes me now is that the failure was semantic. The exchange format moved geometry and names, but not meaning. IFC, with its decades of working groups, public reviews and ISO ratification, is the industry’s long and sometimes frustrating answer to that problem.

Use it with realistic expectations. Treat the ISO edition as your reference text, the version and the model view as your specification, and your own tests as your proof. If you do, IFC will do what it was built to do: carry the meaning of a building from one team to the next, long after the software that created it has been retired.

Where to go next: to look inside a file, read IFC Files Explained: Structure, Classes, and Properties. To compare editions, continue with IFC 2×3 vs. IFC4 vs. IFC4.3: Key Differences, and to exchange properly, How to Export and Import IFC Models Correctly.

Rachid Khouri

Rachid Khouri

Rachid Khouri is a CAD, BIM and GIS professional, Autodesk Authorized Developer, trainer and technical author with more than 30 years of experience, working with AutoCAD since 1992. He founded TheBIMAuthority.com to share practical guidance on BIM workflows, information management, industry standards, digital construction technologies and best practices for AEC professionals.