BIM Management: The Complete Guide for Professionals

BIM Management: The Complete Guide for Professionals

The first time someone introduced me as “the BIM manager”, I corrected them. I said I was a CAD manager who happened to look after some BIM software. They smiled kindly, and the client’s project director said something I have never forgotten: “Whatever you call it, you are the person we phone when the information is wrong.” He was right, and it took me a few more years to accept what that sentence meant. My job was no longer to keep software running. It was to make sure that a team of different people, in different companies, using different tools, produced information that fitted together, arrived on time and could be trusted.

That is BIM management. It is not a software skill, although software skills help. It is not a purely technical role, although technical credibility matters. It is a management discipline: setting direction, agreeing rules, assigning responsibility, controlling quality, managing risk and measuring whether it all worked. In many ways it resembles project management, but its subject is information rather than the works, and its time horizon is both the project and the life of the asset.

This guide is the hub for the whole BIM management section of this site. It explains what BIM management covers, how it differs from related disciplines, what a BIM manager actually does, how the work fits into the ISO 19650 process, which documents carry it and how to build the skills to do it well. It then points you to the detailed guides: the BEP, implementation strategy, roles, goals and uses, the responsibility matrix, planning, quality, risk, performance, day-one setup and project templates.


The Short Answer

BIM management is the planning, organization, control and improvement of how BIM is used on projects and in organizations: setting goals, defining processes and standards, assigning responsibilities, supporting teams, controlling quality and risk and measuring results.

What BIM management covers

It operates at two levels.

LevelFocusTypical ownerTypical outputs
OrganizationalHow the company uses BIM across all projects: strategy, standards, capability, tools, trainingBIM manager, BIM lead, innovation or digital directorImplementation strategy, office standards, templates, training plans, performance reviews
ProjectHow BIM is used on one project: goals, uses, roles, processes, deliverables, quality, riskProject BIM manager or lead appointed party’s information management functionBEP, responsibility matrix, MIDP, coordination procedures, quality reports

In one sentence:

BIM management is making sure that the right information is produced by the right people, to the right standard, at the right time, and that the organization learns from the result.


BIM Management, Project Management and Information Management

These terms overlap, and the overlap causes confusion about who does what.

DisciplinePrimary subjectPrimary questionTypical standard
Project managementThe project: scope, time, cost, quality, risk, peopleWill we deliver the project as agreed?Project management standards and methods
Information managementInformation containers and their lifecycleIs the information correctly requested, produced, shared and kept?ISO 19650 series. See BIM Information Management: The Complete Guide
BIM managementHow BIM is applied: goals, uses, processes, roles, tools, quality and capabilityIs BIM delivering what it should, and are teams able to work this way?Organizational standards, execution plans, ISO 19650 as framework
BIM coordinationIntegrating the work of disciplinesDo the models and information fit together?See BIM Coordination: The Complete Guide
Design managementThe design process and its outputsIs the design progressing and coordinated?Design management practice

In real projects, one person may carry several of these. On a large project, they are distinct functions. What matters is that each is assigned. The BIM manager works with the project manager on programme and risk, with the information manager on the CDE and standards, and with coordinators on the models.


What BIM Management Actually Covers

I describe it as five connected responsibilities.

1. Strategy: Why and How Far

Decide why BIM is used and for what. Define goals, BIM uses, scope and the capability needed. At organizational level, this is the implementation strategy; at project level, the goals and uses in the BEP. See How to Develop a BIM Implementation Strategy and How to Define BIM Goals, Uses, and Project Deliverables.

2. Planning: Who, What, When

Turn strategy into plans: the BIM execution plan, roles and responsibilities, the responsibility matrix, milestones and delivery plans, standards and templates. See BIM Execution Plan (BEP): How to Create and Implement One, BIM Roles and Responsibilities: Manager, Coordinator, Modeler, and Information Manager, How to Create a BIM Responsibility Matrix, and BIM Project Planning: Milestones, Deliverables, and Coordination.

3. Execution: Making It Happen

Support the production and exchange of information: set up the project, mobilize teams, run coordination, manage the CDE, resolve problems. See How to Set Up a Successful BIM Project from Day One and How to Build a BIM Project Template.

4. Control: Staying on Track

Check that information meets the requirements, manage risk, track progress and control change. See BIM Quality Management: Processes, Metrics, and Best Practices and BIM Project Risk Management: Common Risks and Mitigation Strategies.

5. Improvement: Learning

Measure performance, capture lessons and update standards, templates and training. See How to Measure BIM Performance, ROI, and Project Success.

Notice that only one of the five is about modeling. The rest is management, which is why strong modelers do not automatically make strong BIM managers.


The Work of a BIM Manager

Titles vary: BIM manager, BIM lead, digital delivery manager, BIM director, head of information management. The work is recognizable. Here is how a typical week might divide on a mid-sized project.

ActivityExamples
Planning and standardsMaintaining the BEP and standards, updating templates, planning milestones
People and capabilityBriefing and training teams, coaching coordinators, assessing supplier capability
Coordination oversightReviewing federated models, resolving cross-discipline problems, chairing or attending coordination meetings
Quality and complianceRunning or reviewing checks, reporting against the requirements, managing acceptance
Technology and workflowOverseeing CDE configuration, software versions, exports and automation
Stakeholder communicationReporting to the project manager and client, explaining issues in plain language
Risk and changeMaintaining the risk register for information delivery, managing change requests
ImprovementCollecting lessons, measuring performance, proposing changes

Skills Beyond Software

SkillWhy it matters
Technical fluencyCredibility with modelers and coordinators; ability to diagnose problems. See BIM Skills Matrix: Competencies Required for Every Professional Level
Standards knowledgeISO 19650, national annexes, classification, IFC and the openBIM family. See BIM Standards: The Complete International Guide
CommunicationTranslating between designers, managers, clients and IT
Planning and organizationMilestones, dependencies, resourcing
FacilitationRunning workshops and meetings that produce decisions
Quality mindsetDefining criteria and checking against them
Risk thinkingAnticipating where information delivery can fail
Teaching and coachingBuilding the capability of others
Commercial awarenessUnderstanding contracts, procurement and value

My honest view after thirty years: the soft skills decide the outcome. The technical gap can be closed in months. The ability to keep six companies working to one standard without a command structure takes years.


BIM Management Across the ISO 19650 Process

ISO 19650-2 organizes delivery into eight activities. Each has BIM management tasks.

ActivityBIM management tasks
Assessment and needHelp the appointing party define goals, uses, requirements, milestones and standards. See ISO 19650 Information Requirements Explained: OIR, AIR, PIR, and EIR
Invitation to tenderPrepare or review the EIR, tender response requirements and evaluation criteria
Tender responsePrepare the pre-appointment BEP, capability evidence, draft MIDP, mobilization plan and risk register. See How to Respond to BIM Requirements in Tenders
AppointmentConfirm the BEP, complete the responsibility matrix and MIDP, write EIR for suppliers
MobilizationSet up the CDE, standards, templates and workflows; test and train. See How to Set Up a Successful BIM Project from Day One
Collaborative productionRun production, checks, coordination and issue management
Information model deliveryCheck, authorize and submit at milestones; manage acceptance
Project close-outHand over information, archive, capture lessons

See ISO 19650-2: BIM Information Management During Project Delivery.


The Documents of BIM Management

Management needs written, shared documents. These carry most of the work.

DocumentPurposeGuide
Implementation strategyOrganizational direction: vision, scope, roadmapHow to Develop a BIM Implementation Strategy
BIM Execution PlanHow BIM will be delivered on a projectBIM Execution Plan (BEP): How to Create and Implement One
Goals and uses statementWhy BIM is used and for whatHow to Define BIM Goals, Uses, and Project Deliverables
Responsibility matrixWho is responsible for whatHow to Create a BIM Responsibility Matrix
MIDP and TIDPsWhen and by whom information is deliveredMaster Information Delivery Plan (MIDP): Complete Guide
Project information standard and templatesHow information is named, structured and producedHow to Build a BIM Project Template
Quality plan and checklistsHow quality is controlledBIM Quality Management: Processes, Metrics, and Best Practices
Risk registerRisks to information delivery and responsesBIM Project Risk Management: Common Risks and Mitigation Strategies
Performance dashboardProgress and resultsHow to Measure BIM Performance, ROI, and Project Success
Security planProtection of informationBIM Information Security, Access Control, and Data Governance

A good BIM manager keeps these documents short, current and used. A BIM plan that nobody opens is a risk, not a control.


BIM Management From Different Seats

The role changes with the organization you work for.

For the Asset Owner or Client

Management means asking for the right things and checking them: writing requirements, appointing capable teams, accepting deliverables, operating the asset information model. The BIM or information manager on the client side is often the most influential person on the project, because requirements shape everything. See Exchange Information Requirements (EIR): Complete Guide.

For the Design Team

Management means running design information as a coordinated system: standards and templates, model federation, discipline interfaces, quality checks and the information schedule. The lead designer’s BIM manager often becomes the project’s information management function.

For the Contractor

Management means turning design information into construction information: coordinating trades, managing fabrication models, keeping models aligned with site reality, producing as-built and handover information. Many contractors maintain their own BIM management teams.

For Specialists and Subcontractors

Management means meeting someone else’s requirements reliably: understanding the EIR, planning deliveries through a TIDP, controlling quality and using the CDE correctly. Small firms need a lightweight version of the same discipline.

For Facility Managers and Operators

Management means keeping the asset information model alive: trigger events, updates, quality and links to operational systems. See ISO 19650-3: Information Management During Asset Operations.


Building BIM Management Capability in an Organization

Most organizations develop it in stages. Recognizing your stage helps you decide the next move.

StageTypical characteristicsNext step
Ad hocA few enthusiasts use BIM; no common standards; results depend on individualsAgree a minimal standard and a named lead
StandardizedTemplates, naming and basic procedures exist; a BEP is written for projectsTrain, check compliance, introduce quality control
ManagedRoles are defined; performance is measured; supply chain requirements are cascadedUse data to improve; integrate with operations
OptimizedContinual improvement; automation; data feeds business decisionsShare practice, innovate carefully

See BIM Maturity Levels (Level 0 to 3) and the Shift to ISO 19650 for the national maturity vocabulary, and How to Develop a BIM Implementation Strategy for a path between stages.


Typical Problems BIM Managers Face

ProblemUnderlying causeDirection of the remedy
“Nobody follows the standard.”Standards are unclear, too heavy or not enforcedSimplify, train, check and give feedback
“The client keeps changing requirements.”Requirements not fixed or not linked to decisionsEstablish PIR and change control. See Project Information Requirements (PIR): Complete Guide
“Models are late and inconsistent.”No delivery plan or dependency managementBuild a MIDP from TIDPs
“Coordination meetings go round in circles.”Issues untracked, roles unclearUse BCF and a clear issue process. See BIM Collaboration Format (BCF): The Complete Guide
“Subcontractors cannot deliver what we ask.”Capability not assessed; requirements not cascadedAssess early; provide templates and training
“We cannot show BIM is worth it.”No baseline or metricsDefine measures at the start
“I am responsible for everything and have authority over nothing.”Role not defined in the appointmentDefine authority in the BEP and contract

The last one is the quiet killer. A BIM manager without mandate is a messenger. Settle the authority question in writing at the start.


Measuring BIM Management

A few indicators tell you whether the management system works.

IndicatorWhat it shows
On-time delivery rate against the MIDPPlanning reliability
First-time pass rate at quality gatesProduction quality and clarity of standards
Open issues and ageCoordination health
Share of requirements that are verifiableQuality of the requirements
Rework attributed to information problemsCost of poor management
Training coverageCapability
Supplier complianceSupply chain reach

See How to Measure BIM Performance, ROI, and Project Success.


Common Mistakes

  1. Treating BIM management as software administration.
  2. No mandate for the BIM manager.
  3. No written plan, so each team invents its own way of working.
  4. Standards that are too heavy to follow or too light to matter.
  5. Choosing tools before processes.
  6. Ignoring the supply chain’s capability.
  7. No quality control, or quality control only at the end.
  8. No risk management for information delivery.
  9. Not measuring anything.
  10. Never capturing lessons.
  11. Confusing activity with value: more models is not better BIM.
  12. Doing everything personally instead of building capability in others.

See also Common BIM Mistakes Beginners Should Avoid.


A Starter Checklist for a BIM Manager

  1. Is my role and authority written down?
  2. Are the project’s goals and BIM uses agreed?
  3. Is there a BEP that people actually use?
  4. Are roles and responsibilities clear, with a responsibility matrix?
  5. Is there a delivery plan (MIDP, TIDPs) tied to milestones?
  6. Are standards and templates available and tested?
  7. Is the CDE configured, with naming, statuses and permissions?
  8. Are quality checks defined, and run before sharing?
  9. Is there a risk register for information delivery?
  10. Do I have a few metrics and a review routine?
  11. Do we capture lessons at each milestone?

Frequently Asked Questions

What is BIM management?

The planning, organization, control and improvement of how BIM is used on projects and in organizations: goals, processes, standards, responsibilities, quality, risk and performance.

What does a BIM manager do?

Sets and maintains the standards and plans, supports and trains teams, oversees coordination, controls quality and risk, reports progress and drives improvement.

What is the difference between a BIM manager and a BIM coordinator?

The manager works on strategy, standards, planning and control. The coordinator integrates models, runs checks and manages issues between disciplines. See BIM Roles and Responsibilities: Manager, Coordinator, Modeler, and Information Manager.

Is a BIM manager the same as an information manager?

The roles overlap. ISO 19650 defines an information management function; a BIM manager often carries it, but the title is not fixed.

Do I need to be a good modeler to be a BIM manager?

You need technical credibility, but management, communication and standards knowledge matter more as you progress.

How do I become a BIM manager?

Build technical skills, learn the standards, take on coordination and standards responsibilities, then lead a project’s information management. See How to Become a BIM Manager: The Complete Career Guide.

Does every project need a BIM manager?

It needs the function: someone accountable for how information is planned, produced, checked and delivered. On small projects, one person may do it part-time.

How is BIM management related to ISO 19650?

ISO 19650 provides the framework for information management across the asset life cycle. BIM management applies it through plans, standards, roles and control.


Final Thoughts

The project director’s remark, “you are the person we phone when the information is wrong”, still describes the job, but I now hear it differently. If the phone rings often, the management is failing. The best BIM managers I know receive few calls, because they spent their effort earlier: agreeing what was needed, writing it down, assigning it, testing the way of working and checking as they went. The calm they create is invisible, and it is the best evidence of their craft.

If you are starting out, begin with one project and one page: the goals, the roles, the milestones. Add a BEP, a responsibility matrix and a few checks. Measure, learn and repeat. The rest of this section of the site will show you how.

Where to go next: to write the central plan, read BIM Execution Plan (BEP): How to Create and Implement One. For the organizational view, continue with How to Develop a BIM Implementation Strategy, and for the people side, BIM Roles and Responsibilities: Manager, Coordinator, Modeler, and Information Manager.

Rachid Khouri

Rachid Khouri

Rachid Khouri is a CAD, BIM and GIS professional, Autodesk Authorized Developer, trainer and technical author with more than 30 years of experience, working with AutoCAD since 1992. He founded TheBIMAuthority.com to share practical guidance on BIM workflows, information management, industry standards, digital construction technologies and best practices for AEC professionals.