The most common request I receive from new coordinators is, “Just show me the buttons.” I understand. They have inherited a project, a federated model and a deadline, and they want to get from “I opened it” to “I produced something useful” as quickly as possible. So this guide does exactly that. It is a procedural walk through a clash detection cycle in Navisworks, from preparing models to verifying fixes, with the settings that matter and the traps that await. The principles behind the steps are explained in BIM Clash Detection: The Complete Guide and Hard Clashes vs. Soft Clashes vs. Workflow Clashes, and the overall process in BIM Coordination: The Complete Guide. Here, we simply do it.
I will say one thing before the first step, because it saves more time than any tip about buttons: most of the quality of a clash result is decided before you open Clash Detective. Misaligned models, unclean content and missing properties produce results that look like clashes and are not. The preparation steps below look dull, and they are the most valuable.
A note on names: menu labels and panel layouts vary slightly between versions and languages. Navisworks Manage includes the clash detection tool; other editions may not. Navisworks 2027 is reported to have redesigned Clash Detective with clash test folders, a Clash Test Matrix and a results details panel, so the interface you see may differ from older descriptions; check Autodesk’s documentation for your version. This guide describes the logic and the typical elements.
The Short Answer

| Step | Action |
|---|---|
| 1. Prepare | Shared coordinates, clean models, export settings |
| 2. Append | Load all models and check alignment |
| 3. Define sets | Search sets by discipline, system and level |
| 4. Create tests | Test type, tolerance, selections A and B |
| 5. Run | Execute and compare with the previous run |
| 6. Group and assign | One issue per decision |
| 7. Report | Viewpoints, statuses, summaries |
| 8. Verify | Re-run after fixes and close |
In one sentence:
Prepare the models, define dynamic sets, create tests from your clash matrix, run them, group the results into decisions, report and verify.
Step 1: Prepare the Models
Do this in the authoring tools, with the model owners.
| Task | Detail |
|---|---|
| Agree shared coordinates, levels and units | Verify with control points. See BIM Georeferencing: Coordinate Systems and Model Positioning |
| Clean the models | Purge unused content; remove stray elements, duplicates and test geometry; fix warnings that create duplicate geometry or tiny slivers |
| Include the real objects | Insulation, supports, flanges, access and clearance volumes where the stage requires |
| Assign systems and categories | So search sets can select by system |
| Exclude non-coordination content | Furniture, entourage and heavy detail in early passes |
| Use agreed export settings | Published guidance for a common authoring-to-Navisworks workflow lists settings such as exporting with shared coordinates, converting element properties and handling linked files as separate models, plus exporting rooms and systems; set yours in the BEP and save them |
| Export to NWC (or let Navisworks read the source) | Name files consistently with discipline, model and version |
| Set status and revision | Know what is being tested |
See How to Create and Manage a Federated BIM Model for the federation strategy.
Step 2: Append the Models and Check Alignment
- Open a new Navisworks project (or your saved project file).
- Append each model file (File tab, Append). Use caches (NWC) where possible.
- Check the Selection Tree to see that each model appears as a separate file node.
- Check alignment: view the building from plan and elevation; check known points (grid intersections, benchmark elements) in all models; use measure tools to confirm distances. If models are offset or rotated, stop and fix the source or export settings; do not run tests.
- Save the project as an NWF (a federated project that references the files) with a clear name.
- Record the model register: file names, versions, dates, statuses.
Why: Clash results on misaligned models are meaningless.
Step 3: Define Selection and Search Sets
Clash tests compare two selections, so define them carefully.
| Task | Detail |
|---|---|
| Open Find Items | Build queries on properties (category, system name, level, discipline, type) |
| Create search sets | For example “Structural frame”, “Supply air ducts”, “Drainage pipes”, “Cable trays”, “Sprinkler pipes”, “Architectural walls and ceilings” |
| Save each set with a clear name | Consistent naming by discipline, system and level |
| Check each set | Select it and confirm the right elements highlight |
| Create clearance sets if used | Clearance volumes for equipment and access |
| Organize sets in folders | By discipline |
Use search sets rather than fixed selection sets: they re-evaluate when models update. Fixed selections go stale. Dynamic sets depend on consistent properties across models, which is why the information requirements matter. See BIM Metadata, Attributes, and Property Sets Explained.
Step 4: Create the Clash Tests
Create tests from your clash matrix. See How to Create a BIM Clash Detection Matrix.
- Open Clash Detective (Home tab). (In Navisworks 2027, tests can be organized in folders and created in bulk with the Clash Test Matrix, according to a published summary.)
- Add a test and give it a clear name that reflects the matrix: for example “T03 Ducts vs Drainage (hard and clearance)”.
- Choose the selections: in the Select area, pick Selection A and Selection B from your saved sets.
- Choose the test type:
| Test type | Use |
|---|---|
| Hard | Intersections beyond the tolerance |
| Hard (conservative) | Also reports pairs that might clash without surface crossings; more false positives |
| Clearance | Elements closer than the set distance (insulation, access, maintenance) |
| Duplicates | Same element twice |
- Set the tolerance according to the matrix: for hard tests, overlaps smaller than the tolerance are ignored; for clearance tests, the tolerance is the required distance.
- Check the options: whether to test an item against itself (self-intersect), and whether to link the test to a schedule step (for time-based checks, if you use 4D).
- Define rules (Rules tab) to ignore irrelevant results: common default rules include ignoring items in the same layer, in the same file, in the same group or composite object, and items with coincident snap points. Use rules deliberately and document them; each rule hides some results.
- Save the test. Repeat for each test in the matrix.
Tips for Test Design
| Tip | Why |
|---|---|
| One purpose per test | Easier to interpret and assign |
| Name tests consistently | Reports and metrics |
| Separate hard and clearance tests | Different tolerances and owners |
| Test structure against services in a dedicated test | Penetrations need approvals |
| Keep the number of tests manageable | Matrix discipline |
| Save the clash project template | Reuse on similar projects |
Step 5: Run the Tests
- Select the test and choose Run Test (or run all tests).
- Wait for the results; large models can take time.
- Check the status of each test (for example whether it completed with the latest model versions).
- Compare with the previous run: clash results carry statuses such as new (found for the first time in this run), active (found before and not resolved), reviewed, approved and resolved (found previously and not found now). Focus first on new and active results.
- Save the project.
Check for sanity: if a test returns tens of thousands of results, something is wrong: wrong sets, wrong tolerance, misaligned models or too-immature models. Investigate before reporting.
Step 6: Review, Group and Assign
Reviewing Results
- Open the Results tab. Select a result to see the clashing items highlighted in the scene and the clash location.
- Use the viewpoint saved with the result; adjust and re-save if needed.
- Use Selection Tree and Properties to identify the elements: system, level, file.
- Use measure tools to check overlap depth or clearance distance.
- Decide: real problem, noise, approved exception or duplicate.
Grouping
The craft is in grouping raw results into decisions.
| Grouping | Example |
|---|---|
| By cause | Ductwork depth against beam depth along a grid line |
| By location | Level 3 west corridor |
| By system pair | Chilled water against sprinkler main |
| By element | One pipe hitting many hangers |
| By owner | Mechanical, electrical, plumbing |
Navisworks lets you group results and name the groups. Aim for one group per decision. See MEP BIM Coordination: Identifying and Resolving Clashes.
Statuses, Comments and Assignment
| Task | Practice |
|---|---|
| Set statuses | New, active, reviewed, approved, resolved, as appropriate; record who approved and why |
| Add comments | State the decision needed, not only the problem |
| Assign | To a responsible person or role, with a due date (in Navisworks or in your issue tracker) |
| Link to issue tracking | Export to or create issues in your platform; use BCF-based tools for tool-independent exchange. See BIM Issue Tracking and Resolution Using BCF |
| Use SwitchBack where available | Jump from a result to the element in the authoring tool, for authors fixing issues |
Step 7: Report
| Report type | Use |
|---|---|
| Test reports | Results with images, locations and statuses; formats include tabular and HTML reports and report formats that list viewpoints |
| Summary tables | Counts by test, status, group |
| Viewpoint packages | Saved views of key issues for meetings |
| NWD snapshot | A packaged model for reviewers with the federated state |
| Dashboard or metrics | Trends across cycles. See BIM Coordination Meetings: Planning, Reporting, and Best Practices |
Include in the report: models and versions tested, tests and tolerances, rules applied, what the tests do not cover and decisions needed. Keep it short and visual.
Step 8: Verify and Close
- After teams update their source models, collect and export the new versions.
- Refresh the federation (reload changed files; search sets re-evaluate).
- Re-run the tests.
- Check that resolved results have disappeared and that no new problems were introduced.
- Close issues with evidence; reopen those that persist.
- Update sign-off status for zones that meet criteria.
- Archive the snapshot (NWD) and the report.
- Repeat on the cycle.
Automating and Scaling
| Option | Use |
|---|---|
| Saved projects and test libraries | Reuse tests across cycles and projects |
| Search sets by property | Automatic updates |
| Batch processing utilities | Navisworks includes a batch utility for running tasks (such as updating and running tests) from the command line, useful for scheduled overnight runs; check availability in your version |
| Clash Test Matrix (2027) | Creating many tests at once, according to a published summary |
| Scripts and APIs | Custom automation and reporting. See BIM Automation: The Complete Guide |
| Cloud-based model coordination | Platforms offering automatic aggregation and clash tests; see Autodesk Construction Cloud: BIM Collaboration and Data Management |
Troubleshooting
| Symptom | Likely cause | Remedy |
|---|---|---|
| Models do not align | Coordinates, units or origin differ | Fix at source; re-export; check control points |
| Too many results | Wrong sets; no tolerance; immature models; no rules | Check sets and tolerances; apply rules; group |
| Too few results | Weak tests; missing insulation and clearances; incomplete models | Review matrix; include real objects; check model levels |
| Sets select nothing | Properties missing or named differently | Check property names across models; align parameters |
| Test shows old results | Test not re-run after update | Refresh and re-run; check test status |
| Hard clashes missed | Surface-only test limitations | Use hard (conservative) where appropriate; review |
| Navisworks slow or crashing | Models too heavy | Filter content; split federation; hardware; caches |
| Cannot open files | Version mismatch | Standardize versions |
| Elements not identifiable | Properties lost on export | Review export settings |
| Results reappear after fixing | Fix not in the exported model | Verify model version and export |
Common Mistakes
- Running tests on misaligned models.
- No clash matrix or tolerances.
- Fixed selections instead of search sets.
- No rules, or hiding real results with careless rules.
- Reporting raw clash counts.
- No grouping.
- No verification run.
- Testing immature models.
- No record of models, versions and settings.
- Ignoring clearance tests.
- Mixing incompatible versions.
- No archive.
See also Common BIM Mistakes Beginners Should Avoid.
A Short Checklist
- Are models aligned, clean, exported with agreed settings and registered?
- Are search sets defined by consistent properties?
- Are tests created from the matrix, with types, tolerances and documented rules?
- Did we check the results for sanity after the run?
- Are results grouped by cause, location and owner and assigned as decisions?
- Do reports state versions, tests, tolerances, rules, limits and decisions?
- Do we verify by re-running after fixes?
- Do we archive snapshots and reuse test libraries?
- Are versions and export settings standardized?
- Do we track trends over cycles?
Frequently Asked Questions
How do I start a clash test in Navisworks?
Append the models, define search sets, open Clash Detective, add a test, choose selections A and B, set the type and tolerance, and run it.
What clash test types does Navisworks offer?
Hard, hard (conservative), clearance and duplicates, with tolerances, plus rules to ignore certain results.
What is a clash tolerance?
A distance controlling which results are reported: for hard tests, overlaps smaller than it are ignored; for clearance tests, it is the required distance.
Why do I get thousands of clashes?
Usually misaligned models, no tolerances or rules, immature models or wrong sets. Fix preparation and grouping before reporting.
Can Navisworks fix clashes?
No. Fixes are made in the source models; Navisworks reports and verifies.
How do I share clash results?
Through reports, viewpoints, NWD snapshots and issues in your tracking platform, including BCF-based exchange.
Do I need Navisworks Manage for clash detection?
The clash detection tool is part of the Manage edition; check current editions.
What changed in Navisworks 2027 for clashes?
Per published summaries, a redesigned Clash Detective with test folders, a Clash Test Matrix for bulk test creation, bulk renaming and a results details panel.
Final Thoughts
I teach clash detection with a deliberately unspectacular exercise. I give trainees three small models that they must align, clean and test. The models contain, between them, a handful of real clashes and a hundred false ones. The trainees who finish first are not the ones who know the most buttons. They are the ones who spend the first twenty minutes checking alignment, naming sets and thinking about tolerances, and then run one well-designed test. They get eleven results, nine of them real. The others, who ran everything at once, get four thousand.
That is the lesson of this guide. The buttons take an afternoon to learn. The discipline takes longer: prepare, align, define sets, design tests, run, sanity-check, group, report, verify. Follow the steps, keep the records and keep the focus on decisions. The coordination meeting that follows will be about the building.
Where to go next: for the tool in context, read Autodesk Navisworks: The Complete BIM Coordination Guide. For the principles, continue with BIM Clash Detection: The Complete Guide and How to Create a BIM Clash Detection Matrix, and for tracking the results, BIM Issue Tracking and Resolution Using BCF.



