Navisworks Clash Detection: Step-by-Step Guide

Navisworks Clash Detection: Step-by-Step Guide

The most common request I receive from new coordinators is, “Just show me the buttons.” I understand. They have inherited a project, a federated model and a deadline, and they want to get from “I opened it” to “I produced something useful” as quickly as possible. So this guide does exactly that. It is a procedural walk through a clash detection cycle in Navisworks, from preparing models to verifying fixes, with the settings that matter and the traps that await. The principles behind the steps are explained in BIM Clash Detection: The Complete Guide and Hard Clashes vs. Soft Clashes vs. Workflow Clashes, and the overall process in BIM Coordination: The Complete Guide. Here, we simply do it.

I will say one thing before the first step, because it saves more time than any tip about buttons: most of the quality of a clash result is decided before you open Clash Detective. Misaligned models, unclean content and missing properties produce results that look like clashes and are not. The preparation steps below look dull, and they are the most valuable.

A note on names: menu labels and panel layouts vary slightly between versions and languages. Navisworks Manage includes the clash detection tool; other editions may not. Navisworks 2027 is reported to have redesigned Clash Detective with clash test folders, a Clash Test Matrix and a results details panel, so the interface you see may differ from older descriptions; check Autodesk’s documentation for your version. This guide describes the logic and the typical elements.


The Short Answer

Clash tests, step by step

StepAction
1. PrepareShared coordinates, clean models, export settings
2. AppendLoad all models and check alignment
3. Define setsSearch sets by discipline, system and level
4. Create testsTest type, tolerance, selections A and B
5. RunExecute and compare with the previous run
6. Group and assignOne issue per decision
7. ReportViewpoints, statuses, summaries
8. VerifyRe-run after fixes and close

In one sentence:

Prepare the models, define dynamic sets, create tests from your clash matrix, run them, group the results into decisions, report and verify.


Step 1: Prepare the Models

Do this in the authoring tools, with the model owners.

TaskDetail
Agree shared coordinates, levels and unitsVerify with control points. See BIM Georeferencing: Coordinate Systems and Model Positioning
Clean the modelsPurge unused content; remove stray elements, duplicates and test geometry; fix warnings that create duplicate geometry or tiny slivers
Include the real objectsInsulation, supports, flanges, access and clearance volumes where the stage requires
Assign systems and categoriesSo search sets can select by system
Exclude non-coordination contentFurniture, entourage and heavy detail in early passes
Use agreed export settingsPublished guidance for a common authoring-to-Navisworks workflow lists settings such as exporting with shared coordinates, converting element properties and handling linked files as separate models, plus exporting rooms and systems; set yours in the BEP and save them
Export to NWC (or let Navisworks read the source)Name files consistently with discipline, model and version
Set status and revisionKnow what is being tested

See How to Create and Manage a Federated BIM Model for the federation strategy.


Step 2: Append the Models and Check Alignment

  1. Open a new Navisworks project (or your saved project file).
  2. Append each model file (File tab, Append). Use caches (NWC) where possible.
  3. Check the Selection Tree to see that each model appears as a separate file node.
  4. Check alignment: view the building from plan and elevation; check known points (grid intersections, benchmark elements) in all models; use measure tools to confirm distances. If models are offset or rotated, stop and fix the source or export settings; do not run tests.
  5. Save the project as an NWF (a federated project that references the files) with a clear name.
  6. Record the model register: file names, versions, dates, statuses.

Why: Clash results on misaligned models are meaningless.


Step 3: Define Selection and Search Sets

Clash tests compare two selections, so define them carefully.

TaskDetail
Open Find ItemsBuild queries on properties (category, system name, level, discipline, type)
Create search setsFor example “Structural frame”, “Supply air ducts”, “Drainage pipes”, “Cable trays”, “Sprinkler pipes”, “Architectural walls and ceilings”
Save each set with a clear nameConsistent naming by discipline, system and level
Check each setSelect it and confirm the right elements highlight
Create clearance sets if usedClearance volumes for equipment and access
Organize sets in foldersBy discipline

Use search sets rather than fixed selection sets: they re-evaluate when models update. Fixed selections go stale. Dynamic sets depend on consistent properties across models, which is why the information requirements matter. See BIM Metadata, Attributes, and Property Sets Explained.


Step 4: Create the Clash Tests

Create tests from your clash matrix. See How to Create a BIM Clash Detection Matrix.

  1. Open Clash Detective (Home tab). (In Navisworks 2027, tests can be organized in folders and created in bulk with the Clash Test Matrix, according to a published summary.)
  2. Add a test and give it a clear name that reflects the matrix: for example “T03 Ducts vs Drainage (hard and clearance)”.
  3. Choose the selections: in the Select area, pick Selection A and Selection B from your saved sets.
  4. Choose the test type:
Test typeUse
HardIntersections beyond the tolerance
Hard (conservative)Also reports pairs that might clash without surface crossings; more false positives
ClearanceElements closer than the set distance (insulation, access, maintenance)
DuplicatesSame element twice
  1. Set the tolerance according to the matrix: for hard tests, overlaps smaller than the tolerance are ignored; for clearance tests, the tolerance is the required distance.
  2. Check the options: whether to test an item against itself (self-intersect), and whether to link the test to a schedule step (for time-based checks, if you use 4D).
  3. Define rules (Rules tab) to ignore irrelevant results: common default rules include ignoring items in the same layer, in the same file, in the same group or composite object, and items with coincident snap points. Use rules deliberately and document them; each rule hides some results.
  4. Save the test. Repeat for each test in the matrix.

Tips for Test Design

TipWhy
One purpose per testEasier to interpret and assign
Name tests consistentlyReports and metrics
Separate hard and clearance testsDifferent tolerances and owners
Test structure against services in a dedicated testPenetrations need approvals
Keep the number of tests manageableMatrix discipline
Save the clash project templateReuse on similar projects

Step 5: Run the Tests

  1. Select the test and choose Run Test (or run all tests).
  2. Wait for the results; large models can take time.
  3. Check the status of each test (for example whether it completed with the latest model versions).
  4. Compare with the previous run: clash results carry statuses such as new (found for the first time in this run), active (found before and not resolved), reviewed, approved and resolved (found previously and not found now). Focus first on new and active results.
  5. Save the project.

Check for sanity: if a test returns tens of thousands of results, something is wrong: wrong sets, wrong tolerance, misaligned models or too-immature models. Investigate before reporting.


Step 6: Review, Group and Assign

Reviewing Results

  1. Open the Results tab. Select a result to see the clashing items highlighted in the scene and the clash location.
  2. Use the viewpoint saved with the result; adjust and re-save if needed.
  3. Use Selection Tree and Properties to identify the elements: system, level, file.
  4. Use measure tools to check overlap depth or clearance distance.
  5. Decide: real problem, noise, approved exception or duplicate.

Grouping

The craft is in grouping raw results into decisions.

GroupingExample
By causeDuctwork depth against beam depth along a grid line
By locationLevel 3 west corridor
By system pairChilled water against sprinkler main
By elementOne pipe hitting many hangers
By ownerMechanical, electrical, plumbing

Navisworks lets you group results and name the groups. Aim for one group per decision. See MEP BIM Coordination: Identifying and Resolving Clashes.

Statuses, Comments and Assignment

TaskPractice
Set statusesNew, active, reviewed, approved, resolved, as appropriate; record who approved and why
Add commentsState the decision needed, not only the problem
AssignTo a responsible person or role, with a due date (in Navisworks or in your issue tracker)
Link to issue trackingExport to or create issues in your platform; use BCF-based tools for tool-independent exchange. See BIM Issue Tracking and Resolution Using BCF
Use SwitchBack where availableJump from a result to the element in the authoring tool, for authors fixing issues

Step 7: Report

Report typeUse
Test reportsResults with images, locations and statuses; formats include tabular and HTML reports and report formats that list viewpoints
Summary tablesCounts by test, status, group
Viewpoint packagesSaved views of key issues for meetings
NWD snapshotA packaged model for reviewers with the federated state
Dashboard or metricsTrends across cycles. See BIM Coordination Meetings: Planning, Reporting, and Best Practices

Include in the report: models and versions tested, tests and tolerances, rules applied, what the tests do not cover and decisions needed. Keep it short and visual.


Step 8: Verify and Close

  1. After teams update their source models, collect and export the new versions.
  2. Refresh the federation (reload changed files; search sets re-evaluate).
  3. Re-run the tests.
  4. Check that resolved results have disappeared and that no new problems were introduced.
  5. Close issues with evidence; reopen those that persist.
  6. Update sign-off status for zones that meet criteria.
  7. Archive the snapshot (NWD) and the report.
  8. Repeat on the cycle.

Automating and Scaling

OptionUse
Saved projects and test librariesReuse tests across cycles and projects
Search sets by propertyAutomatic updates
Batch processing utilitiesNavisworks includes a batch utility for running tasks (such as updating and running tests) from the command line, useful for scheduled overnight runs; check availability in your version
Clash Test Matrix (2027)Creating many tests at once, according to a published summary
Scripts and APIsCustom automation and reporting. See BIM Automation: The Complete Guide
Cloud-based model coordinationPlatforms offering automatic aggregation and clash tests; see Autodesk Construction Cloud: BIM Collaboration and Data Management

Troubleshooting

SymptomLikely causeRemedy
Models do not alignCoordinates, units or origin differFix at source; re-export; check control points
Too many resultsWrong sets; no tolerance; immature models; no rulesCheck sets and tolerances; apply rules; group
Too few resultsWeak tests; missing insulation and clearances; incomplete modelsReview matrix; include real objects; check model levels
Sets select nothingProperties missing or named differentlyCheck property names across models; align parameters
Test shows old resultsTest not re-run after updateRefresh and re-run; check test status
Hard clashes missedSurface-only test limitationsUse hard (conservative) where appropriate; review
Navisworks slow or crashingModels too heavyFilter content; split federation; hardware; caches
Cannot open filesVersion mismatchStandardize versions
Elements not identifiableProperties lost on exportReview export settings
Results reappear after fixingFix not in the exported modelVerify model version and export

Common Mistakes

  1. Running tests on misaligned models.
  2. No clash matrix or tolerances.
  3. Fixed selections instead of search sets.
  4. No rules, or hiding real results with careless rules.
  5. Reporting raw clash counts.
  6. No grouping.
  7. No verification run.
  8. Testing immature models.
  9. No record of models, versions and settings.
  10. Ignoring clearance tests.
  11. Mixing incompatible versions.
  12. No archive.

See also Common BIM Mistakes Beginners Should Avoid.


A Short Checklist

  1. Are models aligned, clean, exported with agreed settings and registered?
  2. Are search sets defined by consistent properties?
  3. Are tests created from the matrix, with types, tolerances and documented rules?
  4. Did we check the results for sanity after the run?
  5. Are results grouped by cause, location and owner and assigned as decisions?
  6. Do reports state versions, tests, tolerances, rules, limits and decisions?
  7. Do we verify by re-running after fixes?
  8. Do we archive snapshots and reuse test libraries?
  9. Are versions and export settings standardized?
  10. Do we track trends over cycles?

Frequently Asked Questions

How do I start a clash test in Navisworks?

Append the models, define search sets, open Clash Detective, add a test, choose selections A and B, set the type and tolerance, and run it.

What clash test types does Navisworks offer?

Hard, hard (conservative), clearance and duplicates, with tolerances, plus rules to ignore certain results.

What is a clash tolerance?

A distance controlling which results are reported: for hard tests, overlaps smaller than it are ignored; for clearance tests, it is the required distance.

Why do I get thousands of clashes?

Usually misaligned models, no tolerances or rules, immature models or wrong sets. Fix preparation and grouping before reporting.

Can Navisworks fix clashes?

No. Fixes are made in the source models; Navisworks reports and verifies.

How do I share clash results?

Through reports, viewpoints, NWD snapshots and issues in your tracking platform, including BCF-based exchange.

Do I need Navisworks Manage for clash detection?

The clash detection tool is part of the Manage edition; check current editions.

What changed in Navisworks 2027 for clashes?

Per published summaries, a redesigned Clash Detective with test folders, a Clash Test Matrix for bulk test creation, bulk renaming and a results details panel.


Final Thoughts

I teach clash detection with a deliberately unspectacular exercise. I give trainees three small models that they must align, clean and test. The models contain, between them, a handful of real clashes and a hundred false ones. The trainees who finish first are not the ones who know the most buttons. They are the ones who spend the first twenty minutes checking alignment, naming sets and thinking about tolerances, and then run one well-designed test. They get eleven results, nine of them real. The others, who ran everything at once, get four thousand.

That is the lesson of this guide. The buttons take an afternoon to learn. The discipline takes longer: prepare, align, define sets, design tests, run, sanity-check, group, report, verify. Follow the steps, keep the records and keep the focus on decisions. The coordination meeting that follows will be about the building.

Where to go next: for the tool in context, read Autodesk Navisworks: The Complete BIM Coordination Guide. For the principles, continue with BIM Clash Detection: The Complete Guide and How to Create a BIM Clash Detection Matrix, and for tracking the results, BIM Issue Tracking and Resolution Using BCF.

Rachid Khouri

Rachid Khouri

Rachid Khouri is a CAD, BIM and GIS professional, Autodesk Authorized Developer, trainer and technical author with more than 30 years of experience, working with AutoCAD since 1992. He founded TheBIMAuthority.com to share practical guidance on BIM workflows, information management, industry standards, digital construction technologies and best practices for AEC professionals.