Some years ago, I sat in a kickoff meeting where three people from three countries used the same three letters, LOD, and meant three different things. The American architect meant “Level of Development”, with a number between 100 and 500. The British engineer meant “Level of Detail”, the graphical part of the model. The Belgian client’s representative meant “the level of information we need at each stage”, and was slightly offended that nobody seemed to be listening. It took forty minutes to realize that we were not disagreeing, we were simply speaking different dialects of the same language.
That meeting is the reason I wrote this guide. After many years as a CAD manager, then as a BIM consultant and trainer, I have seen LOD, LOI and LOIN confuse more teams than almost any other topic. And the confusion is expensive: models that are too heavy, models that are too poor, contracts that nobody can verify.
In this article, I will untangle the three concepts, explain how they relate, tell you which one to use and when, and show you how to apply them without writing a 200-page specification.
The Short Answer
Here is the whole topic in a few lines.
| Term | Full name | What it describes | Origin |
|---|---|---|---|
| LOD | Level of Development | How far an element’s geometry and information have been developed, on a scale such as LOD 100 to 500 | AIA, BIMForum (North America) |
| Level of Detail | Level of Detail | The amount of graphical (geometric) detail of an element | UK PAS 1192-2 and earlier practice |
| LOI | Level of Information | The amount of non-graphical data attached to an element | UK PAS 1192-2 and earlier practice |
| LOIN | Level of Information Need | The minimum geometric, alphanumerical and documentary information required for a specific purpose | EN 17412-1, ISO 7817-1 |
In one sentence:
LOD is a scale you pick from. LOIN is a specification you build from the actual needs of the project.
If you remember only that, you already understand the main difference. The rest of this guide explains why it matters.
Why Three Concepts Exist: A Short History
The story is useful, because it explains the confusion.
In the early days of BIM, teams needed a way to say “how finished is this model element?” The American Institute of Architects introduced the Level of Development concept in the late 2000s, with a simple five-step scale. The BIMForum later published a detailed specification that shows, element by element, what each level means. It is practical, visual and easy to put in a contract, which explains why it became so popular. If you have not read it yet, my guide BIM Levels of Development (LOD) Explained covers each level in detail.
Meanwhile, in the United Kingdom, PAS 1192-2 took a different path. It separated the idea into two parts: Level of Detail (the graphical side) and Level of Information (the data side), together called Level of Definition. The idea was clean: geometry and data are different things and should be specified separately.
Then Europe and the international community asked a deeper question: why are we specifying levels at all? What matters is whether the information serves its purpose. That reflection produced EN 17412-1 (2020) and later ISO 7817-1, which describe the Level of Information Need. The ISO 19650 series refers to this concept when it explains how information requirements are defined.
So the evolution is: a single scale (LOD), then a split between geometry and data (Detail and LOI), then a purpose-driven specification (LOIN). Each step tried to fix a weakness of the previous one.
For the standards context, see BIM Standards: The Complete International Guide and ISO 7817-1: Level of Information Need Explained.
LOD (Level of Development): The Practical Scale
What It Is
LOD is a numbered scale (100, 200, 300, 350, 400, 500) that tells you how developed an element is and how far you can rely on it. Each number bundles geometry and information together.

Where LOD Works Very Well
- As shorthand. Saying “LOD 300” in a meeting is a quick way to align expectations. No other term is as widely understood.
- In North American contracts. AIA documents and BIMForum are the common language.
- For quick reviews. With the BIMForum illustrations, you can show a subcontractor exactly what “LOD 350” looks like for a duct.
- For beginners. A simple scale is easier to learn than a multi-parameter specification.
Where LOD Falls Short
- It bundles geometry and information. An element can be graphically LOD 200 but need LOD 350 data (for example, a fire rating and a manufacturer for a handover). One number cannot express that.
- It suggests a ladder. Many people believe that higher is always better. It is not.
- It does not say who needs what, or why. A number is not a purpose.
- It is vague about non-graphical information. The BIMForum specification focuses mainly on geometry and basic attributes, not on the full data structure an owner might need.
I have seen projects where “LOD 300” was specified for everything, and the owner still received a model without the data needed to maintain the building. The geometry was perfect, and the information was useless. That is a typical LOD failure.
Level of Detail and Level of Information (LOI): The Split
Level of Detail: The Graphical Side
Level of Detail describes how much graphical content an element has: how closely its shape represents the real object. A duct can be a simple line, a rectangular box, or a fully modeled assembly with insulation, flanges and hangers.
Level of Information (LOI): The Data Side
Level of Information describes how much non-graphical content is attached: identification, classification, material, performance data, manufacturer, maintenance information.
Why the Split Matters
In real projects, the two do not move together.
- A structural column may need an accurate shape early (for coordination) but only a few properties.
- An air handling unit may need a simple shape (a box with connection points) but a very rich set of data (capacity, power, serial number, maintenance schedule).
- A door needs a modest shape but significant data (fire rating, hardware set, acoustic rating).
If you try to express these needs with one number, you either over-specify the geometry or under-specify the information. Separating the two gives you control. That is the major strength of the LOI approach, and the reason the idea survived into the next generation of standards.
LOIN (Level of Information Need): The Modern Framework
What It Is
Level of Information Need is defined by EN 17412-1 and ISO 7817-1. It is not a scale. It is a method for defining what information is required for each element, for a given purpose, at a given time.
The central rule is a principle I wish every contract would print on its first page: the information provided should be limited to what is necessary, and no more.
The Four Questions
LOIN is built around four simple questions.
- Why? What is the purpose of the information? (Coordination, cost estimation, energy analysis, maintenance…)
- When? At which milestone is it needed? (End of concept, end of design, handover…)
- Who? Which actors need it, and who provides it? (Architect, structural engineer, contractor, facility manager…)
- What? Which objects does it concern, and what information about each? (A wall, a pump, a space…)
The Three Types of Information
For each answer, LOIN describes the content in three categories.

- Geometrical information: detail, dimensionality, location, appearance and parametric behavior.
- Alphanumerical information: identification and information content (the properties and values).
- Documentation: documents, drawings, certificates and other files linked to the element.
Notice what this does. Instead of asking for “LOD 350” you can say: “At the design milestone, for coordination between the structural and MEP engineers, steel beams need a 3D body with accurate position and section, a unique identifier, a classification code and a fire protection property. No documents are needed yet.”
That sentence is verifiable. A checker can test it. A modeler knows exactly what to produce. A client can see why it is requested. That is the power of LOIN.
An Important Clarification
LOIN is not a replacement for common sense. It does not tell you which properties to require, and it does not provide a ready-made catalog. You still need to define the content. What it provides is a disciplined way to define it, and a shared vocabulary that is recognized internationally.
LOD vs. LOI vs. LOIN: The Direct Comparison
Here is the comparison I show in my training courses.
| Criteria | LOD | Level of Detail + LOI | LOIN |
|---|---|---|---|
| Type | A numbered scale | Two separate measures | A specification method |
| Geometry and data | Bundled together | Separated | Separated, plus documentation |
| Purpose-driven? | Indirectly (through project stages) | Partly | Yes, by definition |
| Defines “who needs it”? | No | No | Yes |
| Defines “when”? | Through the stage you assign | Through the stage you assign | Yes, per milestone |
| Easy to learn? | Very | Moderately | Requires more discipline |
| Easy to verify automatically? | Limited | Better | Best, especially with IDS |
| Typical use | North America, shorthand worldwide | UK and Commonwealth legacy | Europe, ISO-aligned projects |
| Main risk | “Higher is better” thinking | Unclear definitions | Over-complex specifications |
Read the table across, not down. None of the three is “wrong”. They are tools for different levels of maturity and different regulatory contexts.
Which One Should You Use?
This is the question I get asked most, and my honest answer is: it depends on your contract, your market and your team’s maturity. Here is the practical guidance I give my clients.
If You Work Mainly in North America
Use LOD with the BIMForum specification as your reference. Add explicit information requirements for the data you need, so that LOD is not the only thing defining your deliverables.
If You Work in Europe or in ISO 19650 Projects
Define your requirements in LOIN terms. You can still use LOD as a communication shorthand for geometry. Many European teams do exactly that: “LOD 300 geometry, plus the properties in the attached table”.
If You Work on International Projects
Expect both. The client may speak LOIN while the contractor thinks in LOD. Build a translation table at the start of the project, and write it into the BIM Execution Plan.
If You Are Starting Out
Begin with LOD to understand the stages. Then, as soon as you start writing information requirements, move toward the LOIN way of thinking. It will make your specifications better, even if you never use the term.
A Worked Example: The Same Requirement Written Three Ways
Let me show you how a single requirement looks in each approach. The element: a fire-rated door at the design development milestone, needed for coordination and for the fire safety review.
Written as LOD:
“Doors shall be modeled at LOD 300.”
Short. Clear in geometry. Silent about the fire rating, the hardware, the frame material and the accessibility data the fire safety reviewer actually needs.
Written as Level of Detail + LOI:
“Doors: graphical detail Level 4 (accurate frame and leaf). Information Level 3 (type, fire rating, acoustic rating, hardware set).”
Better, because it separates the two. But “Level 4” and “Level 3” only mean something if both parties use the same definition table.
Written as LOIN:
| Question | Answer |
|---|---|
| Purpose | Design coordination and fire safety review |
| Milestone | End of design development |
| Actors | Architect (provider), fire engineer and checker (receivers) |
| Object | Fire-rated doors |
| Geometry | 3D body with correct overall dimensions and swing direction, positioned in the host wall |
| Alphanumerical information | Unique identifier, classification code, fire rating, acoustic rating, hardware set reference |
| Documentation | None required at this milestone |
The third version takes longer to write, and that is exactly the point. It forces the conversation that the first version avoids. In my experience, the half hour spent writing the LOIN table saves days of arguing later.
How to Build a LOIN Specification in Practice
You do not need to write a table for every element in the building. Here is the approach that works.
Step 1: List Your BIM Uses
Start from the purposes: coordination, quantity takeoff, energy analysis, cost estimation, handover. See BIM Uses Explained: What Is BIM Actually Used For? for a catalog.
Step 2: Define the Milestones
Link the specification to information delivery milestones, not to vague phases. These milestones appear in the MIDP and the BEP.
Step 3: Group Elements Sensibly
Do not write a requirement per element. Group them by system or classification: structural frame, external envelope, HVAC distribution, doors and windows, and so on. A classification system helps a lot. See BIM Classification Systems Compared: Uniclass, OmniClass, Uniformat, and MasterFormat.
Step 4: Specify Geometry, Information and Documentation Separately
For each group and milestone, answer: What geometry is needed? What properties? What documents?
Step 5: Use Existing Property Definitions
Do not invent property names if standard ones exist. The buildingSMART Data Dictionary and IFC property sets are good starting points. See buildingSMART Data Dictionary (bSDD) Explained and BIM Metadata, Attributes, and Property Sets Explained.
Step 6: Make It Checkable
Write requirements in a way that can be tested automatically. A new standard, the Information Delivery Specification (IDS), lets you express such requirements in a machine-readable format. See Information Delivery Specification (IDS): The Complete Guide.
Step 7: Put It in the Right Documents
The requirements belong in the Exchange Information Requirements (EIR), and the delivery team confirms how it will meet them in the BEP and in the MIDP. See Exchange Information Requirements (EIR): Complete Guide.
Using LOD and LOIN Together
Here is a pragmatic hybrid that I have used successfully on many projects. It keeps the best of both worlds.
- Use LOD numbers as a shorthand for geometry only. For example: “Structural frame: LOD 300 geometry at design milestone.”
- Use a separate table for information requirements, organized by classification and milestone, in LOIN style.
- State the reference of each term: “LOD according to the BIMForum Specification, version X” and “information need according to ISO 7817-1”.
- Add a purpose column next to each requirement, so the team understands why.
- Check both with automated model checking. See BIM Model Checking: Geometric and Information Validation.
This approach respects the reality that most people already know the LOD vocabulary, while moving the real substance of the specification toward information needs.
Common Mistakes When Using These Concepts
After many years of reviewing contracts and BIM plans, these are the mistakes I meet most often.
- Using the three terms as synonyms. They are related but not interchangeable. Define your terms at the beginning of the document.
- Specifying one level for the whole project. Different elements, disciplines and milestones need different levels.
- Maximizing instead of optimizing. More geometry and more data mean more cost, heavier models and more errors. LOIN’s principle of “what is needed, no more” is a protection for you.
- Forgetting the information. Geometry is easy to see. Missing properties are invisible until someone needs them.
- Ignoring documentation. Manuals, certificates and warranties are part of the information need, especially for handover.
- Writing requirements nobody can verify. If you cannot check a requirement, it is a wish, not a requirement.
- Copying a specification from another project. A LOIN table written for a hospital does not fit a warehouse.
- Confusing the software’s view detail with the level of detail of the model. In Revit, “Coarse, Medium, Fine” controls display, not development level. See BIM Levels of Development (LOD) Explained for the explanation.
- Leaving the receiver out. If the people who will use the information are not part of the discussion, the specification will miss their needs.
For other beginner errors, see Common BIM Mistakes Beginners Should Avoid.
How This Connects to the Rest of Your BIM Process
These concepts do not live alone. They connect to almost everything else in a BIM project.
- Information requirements: the LOIN is part of what the EIR communicates. See ISO 19650 Information Requirements Explained: OIR, AIR, PIR, and EIR.
- The BIM Execution Plan: the delivery team describes how it will meet the requirements. See BIM Execution Plan (BEP): How to Create and Implement One.
- The responsibility matrix: who produces which level. See How to Create a BIM Responsibility Matrix.
- Quality control: checking that the delivered information matches the requirement. See BIM Quality Assurance vs. Quality Control: Processes and Checklists.
- BIM dimensions: the same model supports 4D, 5D and 7D uses, each with different needs. See BIM Dimensions Explained: 3D, 4D, 5D, 6D, and 7D.
Frequently Asked Questions
What is the difference between LOD and LOIN?
LOD is a numbered scale of development that bundles geometry and information. LOIN is a method for defining the minimum geometrical, alphanumerical and documentary information needed for a specific purpose, milestone and actor.
What does LOI mean in BIM?
LOI means Level of Information: the amount of non-graphical data attached to a model element, such as properties, classification and identification. It is the data counterpart of Level of Detail.
Is LOIN replacing LOD?
In European and ISO-based practice, LOIN is the recommended approach. In North America and in many international contracts, LOD remains the everyday language. Many projects use both: LOD as shorthand for geometry and LOIN thinking for the specification.
Which standard defines LOIN?
EN 17412-1 (Level of Information Need) and ISO 7817-1 define it. ISO 19650 uses the concept in its information requirements processes.
Is Level of Detail the same as Level of Development?
No. Level of Detail is only the graphical richness of an element. Level of Development (in the AIA and BIMForum sense) covers the reliability of both geometry and information.
Do I need LOIN on a small project?
You do not need a formal LOIN document, but the thinking helps on every project: why do we need this information, when, who needs it, and what exactly is needed? A half-page table is often enough.
How do I check that a model meets its LOIN?
By combining visual review, rule-based model checking and, increasingly, machine-readable specifications such as IDS. Define the check when you define the requirement.
Final Thoughts
When I look back at the meeting where three people used LOD in three ways, I realize that nobody was wrong. We simply lacked a shared definition, and we had not asked the question that matters most: what do we actually need to know, and why?
That question is the real heart of LOIN, and it is also the best habit you can adopt, whichever vocabulary you use. A level is not a goal. A number is not a requirement. A requirement is a purpose, a moment, a person and a piece of information that connect. Write that, and you will rarely need to argue about three letters again.
Where to go next: if you have not yet read it, start with BIM Levels of Development (LOD) Explained to see each LOD level illustrated. Then continue with ISO 7817-1: Level of Information Need Explained for the standard itself, and Exchange Information Requirements (EIR): Complete Guide to learn where these specifications live in a real project.