The most useful quality control tool I know fits on one sheet of paper and is used by the person who made the model, before anyone else sees it. It is not an audit, not an automated rule set and not a review by a manager. It is a self-check: a short list of questions that an author runs through before publishing, written in the language of the discipline, designed to catch the mistakes that experience has shown to be most common and most expensive. An architect checks that every room is bounded and numbered. A structural modeler checks that the grids match the shared grids. An MEP modeler checks that no pipe ends in thin air. Each of these checks takes a minute. Each, skipped, produces a coordination issue, a wrong schedule or a clash that costs hours to untangle.
Quality control (QC) is the set of activities that check that a deliverable meets its requirements; quality assurance (QA) is the set of processes that make good deliverables likely. In BIM, QC is the author’s and checker’s daily work, and QA is the framework (standards, templates, training, planning) that supports it. See BIM Quality Assurance vs. Quality Control: Processes and Checklists. This guide provides a practical QC checklist in four parts: common checks for every model, and discipline-specific checks for architectural, structural and MEP models. It includes a sign-off sheet, guidance on when and how to run the checks, a worked fictional example, notes on automating what can be automated and the mistakes to avoid. It complements BIM Model Audit Checklist: Complete Guide, which supports independent audits, and works with the discipline-specific guides Architectural BIM Model Auditing and Quality Control, Structural BIM Model Validation and Quality Assurance and MEP BIM Model Quality Control and Validation. QC checks support professional responsibility for design; they do not replace calculations, code compliance review or engineering judgment.
Free Download
Download: BIM quality control checklist (ZIP with Excel file)
The download is a ZIP archive containing an Excel workbook with the common, architectural, structural and MEP checks, a sign-off sheet and automatic pass counts. It is free to use and adapt for your own projects. Adapt it to your contract, client requirements and standards; it supports professional judgment and is not legal advice.
The Short Answer

| Part | Scope |
|---|---|
| All models | Coordinates, levels, naming, units, warnings and data |
| Architectural | Rooms, walls, openings, stairs, fire and accessibility data |
| Structural | Grids, members, materials, openings and analytical links |
| MEP | Systems, connectivity, clearances and equipment data |
In one sentence:
Authors run a short, discipline-specific QC checklist before every exchange, record the result and fix failures before others see the model.
How to Use the Checklist
| Practice | Why |
|---|---|
| Run it before every publication | Prevent problems reaching others |
| Run common checks first, then discipline checks | Systematic |
| Record results on the sign-off sheet | Evidence and learning |
| Fix failures, then re-run the failed checks | Verify |
| Keep the checklist short | Authors use short lists |
| Review and update it | After issues and at stage gates |
| Automate checks where possible | Free people for judgment. See Automated BIM Model Checking and Data Validation |
| Use independent audits as well | Authors miss their own blind spots. See BIM Model Audit Checklist: Complete Guide |
Mark each item P (pass), F (fail) or N/A, and note anything unusual.
Part A: Common Checks (All Models)
| # | Check | P / F / N/A |
|---|---|---|
| A1 | File name and metadata follow the naming convention and status rules. See BIM Model Naming Convention Template and Guidelines | |
| A2 | Model is in the correct template and software version per the BEP | |
| A3 | Coordinates, origin, rotation, units and height datum match the coordinate sheet; control points checked. See BIM Georeferencing: Coordinate Systems and Model Positioning | |
| A4 | Levels and grids are the shared ones, unchanged and pinned or locked | |
| A5 | Model contains only what is in its scope; no other discipline’s elements copied in | |
| A6 | Linked models are current, correctly positioned and named | |
| A7 | No imported or unused CAD, test geometry or stray elements | |
| A8 | Warnings reviewed; critical warnings resolved. See Revit Model Health and Optimization: File Size, Warnings, Links, and Performance | |
| A9 | No duplicate or overlapping elements | |
| A10 | Elements are in the correct categories and classes; IFC mapping checked | |
| A11 | Required parameters are filled; values valid; units correct | |
| A12 | Classification codes present and valid | |
| A13 | Element identifiers stable (no unnecessary deletion and recreation) | |
| A14 | Level of information need met for the stage | |
| A15 | Views, sheets and schedules are generated from the model and named per the standard | |
| A16 | Model opens, synchronizes and exports without errors; file size reasonable | |
| A17 | IFC exported with the agreed settings, opened in an independent viewer and checked | |
| A18 | Previous issues assigned to me are addressed and ready for verification | |
| A19 | Release notes written (what changed, known limitations) |
Part B: Architectural Model Checks
| # | Check | P / F / N/A |
|---|---|---|
| B1 | Rooms and spaces are placed, enclosed and bounded; every room has a number, a name per the standard and an area; no unplaced, redundant or overlapping rooms | |
| B2 | Room data (use category, department, finishes, occupancy) filled as required | |
| B3 | Walls use the project’s wall types; correct fire, acoustic and thermal data present; heights and top and base constraints correct; no unjoined or gapped walls where a continuous element is intended | |
| B4 | Doors and windows are hosted, have correct types, marks, swing and fire-rating data, and are not duplicated; the door schedule matches the model | |
| B5 | Floors, ceilings and roofs have correct types, thicknesses and levels; ceiling heights agree with the design | |
| B6 | Stairs, ramps and lifts have correct dimensions, headroom and landings; openings in slabs match | |
| B7 | Curtain walls and façades have correct panel and mullion types, positions and data | |
| B8 | Fire compartments and escape routes are modeled or marked as required by the stage; fire-rated elements are continuous where required | |
| B9 | Accessibility features (clear widths, turning spaces, thresholds) are modeled where required for checking | |
| B10 | Openings and penetrations for services and structure follow the agreed process; no unapproved openings | |
| B11 | Shared elements (levels, grids, core geometry used by others) are stable and issued to others | |
| B12 | Areas and schedules: area plans or schedules agree with the model and the area standard; gross and net areas reconcile | |
| B13 | Materials and finishes are assigned consistently | |
| B14 | Furniture and equipment included only as required; fixed equipment locations agreed with services | |
| B15 | Drawings: plans, sections and elevations are consistent with each other and with the model; tags and dimensions are model-driven | |
| B16 | Phases and existing elements (for refurbishment) are correctly assigned. See BIM Modeling for Renovation and Existing Buildings |
Part C: Structural Model Checks
| # | Check | P / F / N/A |
|---|---|---|
| C1 | Grids and levels coincide with the shared grids and levels; structural level references (top and bottom of elements) are correct | |
| C2 | Columns, beams, walls, slabs and foundations are in the correct structural categories, with correct types, sizes and materials | |
| C3 | Element continuity: columns run through levels as intended; beams connect to columns and walls; no unintended gaps | |
| C4 | Joins and overlaps: slabs, walls and beams are joined or cut correctly; no duplicate or overlapping members | |
| C5 | Material and grade data are assigned (concrete grade, steel grade) and consistent with specifications | |
| C6 | Structural usage and load-bearing flags are set correctly; non-structural elements are not in the structural model | |
| C7 | Openings and penetrations: structural openings are modeled where agreed and match services requests; no unapproved holes in primary members | |
| C8 | Cantilevers, offsets and eccentricities reflect the design | |
| C9 | Foundations and ground interface: pile, footing and slab positions and levels agree with the design and ground information | |
| C10 | Reinforcement: if modeled, cover, spacing and bar marks follow the standard; if not modeled, reinforcement information is carried as required. See Reinforcement Modeling in BIM: Rebar and Detailing Workflows | |
| C11 | Analytical model link: analytical members correspond to physical members; changes are reconciled; assumptions recorded. See Structural BIM vs. Structural Analysis Models | |
| C12 | Steel connections and details: modeled or referenced to the level required at the stage | |
| C13 | Coordination with architecture: structural elements align with architectural walls, stairs and openings. See How to Coordinate Structural and Architectural BIM Models | |
| C14 | Quantities: concrete volumes and steel weights are plausible and reconcile with schedules | |
| C15 | Temporary or construction-stage elements are excluded or clearly separated |
Part D: MEP Model Checks
| # | Check | P / F / N/A |
|---|---|---|
| D1 | Systems are defined and assigned: every duct, pipe, tray and equipment item belongs to a named system with the standard abbreviation | |
| D2 | Connectivity: no open ends or disconnected segments; fittings and equipment connected; flow direction correct. See MEP BIM Model Quality Control and Validation | |
| D3 | Sizes and parameters: duct and pipe sizes, flows and capacities filled where required, consistent with design calculations | |
| D4 | Elevations and routing: services are at agreed levels and zones; no routing through structure without an approved opening | |
| D5 | Gravity drainage slopes are correct and continuous; invert levels are consistent. See Plumbing BIM Modeling: Pipes, Fixtures, and Drainage | |
| D6 | Equipment: types, tags and data (capacity, power, weight) filled; connection points modeled | |
| D7 | Clearances: maintenance, access and insulation clearances modeled or checked; access panels and working space provided. See BIM for Mechanical Equipment and Plant Rooms | |
| D8 | Fire dampers, firestopping and penetrations at fire-rated elements are modeled where required and coordinated with the architect and structure | |
| D9 | Insulation and supports: modeled or represented to the level of information needed at the stage | |
| D10 | Spaces and zones: MEP spaces correspond to architectural rooms; zone assignments are complete if used for load calculations | |
| D11 | Electrical: panels, circuits, cable trays and lighting are assigned and labeled; panel schedules update from the model. See Electrical BIM Modeling: Power, Lighting, and Distribution | |
| D12 | Fire protection: sprinkler heads, pipes and risers meet coverage and clearance requirements as modeled. See Fire Protection BIM Modeling and Coordination | |
| D13 | Coordination: clash tests against structure and architecture show no unexplained hard clashes; clearance issues are reviewed. See MEP BIM Coordination: Identifying and Resolving Clashes | |
| D14 | Labels and tags: tagging and annotation follow the standard | |
| D15 | Quantities: lengths and counts are plausible and reconcile with schedules |
Sign-Off Sheet (Template)
| Field | Content |
|---|---|
| Project and model | [Harbor View Clinic; HVC-ARC-V1-ZZ-M3-A-0001] |
| Version and status | [v14; S1] |
| Author | [Name] |
| Date | [Date] |
| Common checks (Part A) | [19 items: 18 P, 1 F, 0 N/A] |
| Discipline checks (Part B, C or D) | [16 items: 15 P, 1 F, 0 N/A] |
| Failures and actions | [List: ID, description, action, owner, due date] |
| Re-check after fixes | [Date; result] |
| Independent check (if required) | [Name; date] |
| Release approval | [Name; date] |
A Worked Illustration (Fictional)
An architectural model is checked before a coordination exchange: Part A has 19 items (18 pass, 1 fail, 0 not applicable) and Part B has 16 items (15 pass, 1 fail, 0 not applicable). Total items = 19 + 16 = 35; passes = 18 + 15 = 33; failures = 2. Pass rate = 33 ÷ 35 ≈ 94.3%. The two failures are (A4) a level elevation altered locally by 20 mm and (B1) four rooms without numbers. Although the pass rate looks high, the level change is a critical coordination risk: the author restores the shared level from the reference, numbers the rooms, re-runs A4 and B1 (both pass) and publishes. A high pass rate does not excuse a critical failure. (Figures are invented for illustration.)
Automating What You Can
| Check type | Automation approach |
|---|---|
| Naming and metadata | Pattern validation on file names; CDE rules |
| Required properties and valid values | Rule-based checkers and IDS validation. See Information Delivery Specification (IDS): The Complete Guide |
| Warnings, file size, unused content | Model health tools and scripts |
| Duplicate elements and unplaced rooms | Model checkers and scripts |
| Coordinates and levels against reference | Automated comparison with the reference model |
| Clash and clearance tests | Clash tools with matrices. See BIM Clash Detection Report Template and Instructions |
| IFC export validation | IFC validators and independent viewers |
| Schedules reconciliation | Scripts that compare quantities to schedules |
Automation handles “is it there and is it valid?”; people handle “is it right?”. See Solibri: BIM Model Checking and Validation Guide.
Frequency and Responsibility
| Check | When | Who |
|---|---|---|
| Author QC (this checklist) | Before every publication | Model author |
| Peer review | At key stages or for critical models | A second modeler or discipline lead |
| Automated checks | After every upload or nightly | Information manager or pipeline |
| Coordination checks | Every coordination cycle | Coordinator |
| Independent audit | At stage gates and before handover | Auditor |
| Handover checks | Before delivery | Information manager and contractor. See BIM Model Handover Checklist and Requirements |
Common Mistakes
- No author self-check.
- A checklist too long to use.
- Checking only geometry and not data.
- Not recording results.
- Moving shared levels or grids locally.
- Ignoring warnings.
- Publishing without exporting and inspecting IFC.
- Treating a high pass rate as proof of quality.
- No re-check after fixes.
- No discipline-specific checks.
- Never updating the checklist.
- Assuming QC replaces professional review.
See also Common BIM Mistakes Beginners Should Avoid.
A Short Checklist
- Do authors run common and discipline-specific checks before every publication?
- Are results recorded on a sign-off sheet?
- Are critical failures fixed before release, regardless of the pass rate?
- Do we re-check failed items after fixes?
- Is IFC exported and inspected independently?
- Are automated checks covering the repeatable items?
- Do we have peer review and independent audits at the right points?
- Is the checklist reviewed and updated after issues and at stage gates?
Frequently Asked Questions
What is BIM quality control?
The checking of models against requirements to confirm they are fit for use before they are shared or delivered.
What is the difference between QC and QA?
QC checks deliverables; QA is the set of processes and standards that make good deliverables likely.
Who runs the QC checklist?
The model author, before publication, with peer review and independent audits at key points.
How long should QC take?
Authors’ self-checks should take minutes to an hour per model, depending on size; keep the list short.
Which checks can be automated?
Naming, required properties, valid values, duplicates, warnings, coordinates against a reference, clash tests and IFC validation.
Should I use the same checklist for every discipline?
Use common checks for all and discipline-specific checks for architecture, structure and MEP.
What if a check fails?
Fix it, re-run the check, record the result and then publish.
Does passing the checklist mean the design is correct?
No. It confirms the model is complete and consistent with its requirements; design adequacy and compliance require professional review.
Final Thoughts
A structural modeler I know has a habit I have adopted. Before he publishes, he reads the checklist aloud, quietly, to himself, and answers each item with a short phrase: “Grids match. Levels match. Materials set. Openings agreed.” It takes ninety seconds. He told me why. “When I just tick boxes, I tick without looking. When I say it, I have to see it.” In four years, he has not published a model with a misaligned grid. His colleagues, who tick, have occasionally.
That is the point of a QC checklist: a short list, used by the author, in the language of the discipline, every time. Use the common checks for every model, the discipline checks for what only your trade knows, automate the repeatable items, record the results and always fix critical failures before release. A habit of ninety seconds protects a day of coordination.
Download the template: BIM quality control checklist (ZIP with Excel file).
Where to go next: for independent audits, read BIM Model Audit Checklist: Complete Guide. For the discipline guides, continue with Architectural BIM Model Auditing and Quality Control, Structural BIM Model Validation and Quality Assurance and MEP BIM Model Quality Control and Validation, and for automation, Automated BIM Model Checking and Data Validation.