Few words in BIM cause as many quiet misunderstandings as “soft clash”. I have sat in meetings where a coordinator said, “There are no hard clashes left, only soft ones,” and the contractor heard “everything is fine,” while the coordinator meant “the problems that remain are mostly about clearances and access.” Both were using the word correctly according to their own training. Neither had noticed that they meant different things. Three weeks later, a team on site discovered that a row of valves was installed behind a duct, in a position where nobody could ever turn the handles. In the model, there had been no hard clash. There had been a clearance problem, and nobody had been tracking it.
The terminology of clashes seems trivial until it matters. And it matters because different kinds of conflict need different tests, different owners, different tolerances and different responses. A hard clash is a geometry problem, usually solved by moving something. A clearance problem is a requirements problem, solved by deciding how much space an object needs and then protecting it. A workflow problem is a sequence problem, solved by changing the order or the access plan, not by moving the geometry at all. Lump them together as “clashes”, and you will test for the first, ignore the second and miss the third.
This guide defines the three families clearly, shows how common tools use the words (including the places where they disagree), explains how to detect and resolve each, provides examples, gives a classification scheme for your BEP and covers how to report them. It supports BIM Clash Detection: The Complete Guide and How to Create a BIM Clash Detection Matrix.
The Short Answer

| Kind | Meaning | Typical detection | Typical resolution |
|---|---|---|---|
| Hard clash | Two elements occupy the same physical space | Geometric intersection test | Move, resize or reroute one element |
| Soft clash (common usage: clearance clash) | An element violates required space around another: insulation, access, maintenance, safety or code distance | Clearance test using a defined distance or clearance volumes | Protect the clearance by moving or redesigning, or approve a deviation with mitigation |
| Workflow clash (also called 4D or time-based) | The sequence, timing or access makes construction or maintenance impossible or unsafe, even though geometry does not collide | 4D simulation, constructability review, logistics checks | Change sequence, access, packaging, or design |
In one sentence:
Hard clashes are about space occupied, soft clashes are about space required and workflow clashes are about time and access.
Hard Clashes
Definition
A hard clash is a geometric intersection: two elements overlap in space. Examples:
- A pipe passing through a duct.
- A duct passing through a beam with no opening.
- A column intersecting a wall of another discipline’s model, where both claim the same space.
- A cable tray through a ceiling grid.
How Tools Detect Them
Clash tools test whether the geometry of selection A intersects the geometry of selection B by more than a set tolerance. In one widely used tool’s documentation, a hard clash is exactly that: an intersection by more than the tolerance, with the clash’s severity reported as a negative distance (the more negative, the deeper the penetration). The tool also offers a conservative variation that reports pairs which may clash even when no surfaces cross (for example, an object entirely inside another), at the price of more false positives.
Which Hard Clashes Matter
| Likely important | Likely trivial |
|---|---|
| Services through structure with no approved opening | Overlaps within modeling tolerance |
| Services through services in a congested void | Elements deliberately modeled in two models |
| Equipment overlapping structure or walls | A pipe touching its own sleeve |
| Penetrations through fire-rated elements | Duplicate elements in the same location (a different problem: duplicates) |
Handling
- Group by cause and location.
- Decide who moves, using agreed priorities.
- Check design implications before changing size, fall or route.
- Update the source model.
- Verify in the next run.
Soft Clashes (Clearance Clashes)
Definition and Terminology
In common coordination usage, a soft clash is a clearance clash: a violation of the space an object needs, without a geometric intersection. Examples:
- A valve with no room to operate the handle.
- A pipe with no space for its insulation.
- An electrical panel with its working space occupied by another service.
- A fan coil unit with no space to remove the filter.
- A damper with no access panel position.
- A pipe too close to a structural element for hanger installation.
A caution about words. Not every tool uses “soft clash” this way. One widely used tool’s documentation states explicitly that clearance clashes are not the same as “soft” clashes: it defines clearance clashes as static geometry coming within a set distance of other geometry, and soft clashes as potential clashes between moving components, detected when clash testing is linked to an animation. So a team using that tool, and speaking of “soft clashes”, may mean something quite different from a team using the common industry sense.
Recommended Practice
- Use “clearance clash” for static space violations in your documents.
- Use “dynamic” or “time-based clash” for moving components and sequences.
- If you use “soft clash”, define it in the BEP.
How to Detect
| Method | Description |
|---|---|
| Clearance test with distance | Test elements against others with a tolerance equal to the required distance (for example insulation thickness or minimum working space) |
| Clearance volumes | Model invisible volumes around equipment, valves, panels and access paths from manufacturer data or codes; run hard tests against them |
| Clearance data | Record required clearances as properties so that tests and checks can use them |
| Rule-based checks | Model checkers with rules for minimum distances |
Sources of Required Clearances
Clearances come from manufacturer instructions, design standards, regulations, accessibility requirements and safety codes. They vary by equipment, jurisdiction and application. Record the source of each clearance in the data or the coordination plan. Do not invent values.
Handling
| Option | When |
|---|---|
| Move or redesign | The clearance is required and cannot be waived |
| Approve a deviation with mitigation | Another solution gives equivalent access or safety, approved by the responsible designer and, where required, the authority |
| Rationalize | Combine services, relocate equipment, add access panels |
Never approve a clearance clash silently. Record who approved what and why.
Workflow Clashes
Definition
A workflow clash is a conflict in time, sequence or access that does not appear as a geometric clash in a static model. Examples:
- A large duct section that cannot be lifted into place because a pipe rack installed earlier blocks the route.
- Equipment that has to enter a plant room through a wall that is built before the equipment arrives.
- Two trades needing the same work area at the same time.
- A system that must be installed from a platform that cannot be erected because of other work.
- A maintenance task that requires removing another system first.
- A prefabricated module that cannot be lifted by the crane available.
- Fire stopping that cannot be applied after services are installed in a particular order.
How to Detect
| Method | Description |
|---|---|
| 4D simulation | Link the model to the programme and review the sequence visually. See 4D BIM Explained: Construction Scheduling and Simulation |
| Constructability workshops | Contractors and installers walk the model and challenge sequence and access |
| Logistics modeling | Paths for lifting, delivery and replacement |
| Dynamic clash tests | Tests of moving objects along paths (in tools that support it): cranes, equipment, lifting arcs |
| Access and maintenance reviews | Paths and working spaces for maintenance |
| Work area planning | Zones with trade assignments by date |
Handling
| Option | When |
|---|---|
| Change sequence | Install in a different order |
| Change access | Temporary openings, different lifting plan |
| Change packaging | Smaller prefabricated sections |
| Change design | Move equipment, add access, change routes |
| Change schedule | Separate trades in time or space |
Workflow clashes are typically owned by construction management and trade contractors more than by designers, which is why trade coordination and constructability reviews matter.
Other Categories You May Need
| Category | Meaning |
|---|---|
| Duplicate clash | The same element in two models, or twice in one model. Detected by duplicates tests |
| Interface or information clash | Conflict in information rather than geometry: two models with different levels, different grids or different sizes for the same item |
| Missing element | Something that should be there is not: a sleeve, a support, an access panel |
| Compliance clash | A clearance or distance that violates a code requirement |
| Stale or version clash | A result from an outdated model |
A good classification scheme includes the categories that matter for your project.
A Classification Scheme for the BEP
| Code | Kind | Definition | Detection | Owner (typical) |
|---|---|---|---|---|
| H | Hard | Geometry intersects beyond tolerance | Hard test | Owners of the elements; coordinator tracks |
| C | Clearance | Required space is violated (insulation, access, working space, code distance) | Clearance test or volumes | Owner of the equipment with the clearance; coordinator tracks |
| W | Workflow | Sequence, timing or access makes work impossible or unsafe | 4D, workshops, logistics checks | Contractor and trades |
| D | Duplicate | Same element twice | Duplicates test | Model owners |
| I | Information | Inconsistent levels, grids, sizes or data across models | Model checks, reviews | Information manager; model owners |
| M | Missing | Required element absent | Checks and reviews | Responsible designer |
Use the codes in issue titles and reports, so that filtering and measurement are possible.
Prioritizing: Consequence Over Count
| Consequence | Examples | Priority |
|---|---|---|
| Life safety or compliance | Fire-rated penetrations without solutions; sprinkler obstruction; escape route obstruction; electrical working space | Highest |
| Impossible to build or maintain | Equipment cannot be installed or replaced; valves inaccessible; workflow blockage | High |
| Significant cost or delay | Structural openings required after pour; services overcrowded in void | High |
| Local rework | Small conflicts resolved by local adjustment | Medium |
| Cosmetic or negligible | Within tolerance; no practical consequence | Low |
Rank by consequence, not by the number of raw results. A single missing fire-stopping record can outweigh a thousand trivial overlaps.
Reporting by Kind
| Report element | Content |
|---|---|
| Counts by kind and status | Hard, clearance, workflow, others; open, resolved, approved |
| Top groups | The most important decisions pending by kind |
| Approvals and deviations | Which clearance deviations were approved, by whom, with reasons |
| Workflow items | Listed separately with owners from construction management |
| Trend by cycle | Whether each kind is converging |
| Limits | What the tests do not cover |
Separating kinds prevents the “no hard clashes left, so we are done” misunderstanding. See BIM Coordination Meetings: Planning, Reporting, and Best Practices.
Examples: One Corridor, Three Kinds
Consider a ceiling void above a corridor.
| Observation | Kind | Response |
|---|---|---|
| A supply duct passes through a sprinkler main | Hard | The duct lowers by 100 mm with revised hangers; the sprinkler designer confirms |
| A chilled water valve sits directly above a cable tray with no operating space | Clearance | The valve moves to a position with access; the model updates; the clearance data is recorded |
| A large prefabricated pipe rack cannot be lifted into the corridor because the ceiling grid is installed first | Workflow | The sequence changes: the rack is installed before the ceiling grid; the programme is adjusted |
| The same riser appears in two models | Duplicate | The model owners agree the master; the other model removes it |
| The mechanical model uses an older level definition | Information | The model owner updates levels and re-exports |
The same corridor, five different problems, five different tests and owners.
Common Mistakes
- Treating all clashes as hard clashes.
- Using “soft clash” without a definition.
- No clearance tests or volumes.
- Approving clearance clashes without records.
- Ignoring workflow clashes until site.
- Reporting only hard clash counts.
- Not separating kinds in reports and metrics.
- Using values for clearances without sources.
- Prioritizing by count instead of consequence.
- No owner for workflow clashes.
- Assuming duplicates are real clashes.
- No classification scheme in the BEP.
See also Common BIM Mistakes Beginners Should Avoid.
A Short Checklist
- Have we defined hard, clearance, workflow and other kinds in the BEP?
- Do we use clear words (clearance, dynamic) and define any use of “soft clash”?
- Do we have clearance tests or volumes, with sourced values?
- Do we use 4D, constructability and logistics reviews for workflow clashes?
- Do we have a classification scheme with codes and owners?
- Do we prioritize by consequence?
- Do we record approvals and deviations with reasons?
- Do reports separate kinds and state limits?
- Are duplicates and information clashes handled separately?
- Do we track trends by kind?
Frequently Asked Questions
What is a hard clash?
A geometric intersection between two elements occupying the same space.
What is a soft clash?
In common usage, a clearance clash: an element violates the space required around another. Some tools use “soft clash” for moving components, so define your use.
What is a workflow clash?
A conflict in sequence, timing or access that prevents construction or maintenance even though static geometry does not collide.
How do I detect clearance clashes?
With clearance tests using a required distance or with modeled clearance volumes, based on manufacturer, standard or code requirements.
How do I detect workflow clashes?
With 4D simulation, constructability reviews, logistics and access modeling, and dynamic tests where tools support them.
Which clashes should I resolve first?
Those with the greatest consequence: life safety and compliance, impossible build or maintenance, then major cost or delay.
Who owns each kind of clash?
Hard and clearance clashes are owned by the element owners, with the coordinator tracking. Workflow clashes are mainly owned by the contractor and trades.
Can a model have no hard clashes and still have problems?
Yes. Clearance, workflow, duplicate, missing-element and information problems are not hard clashes.
Final Thoughts
The row of inaccessible valves became a small legend in the contractor’s office. They now keep a photograph of it above the coordinators’ desks, with a caption: “No hard clash.” It reminds everyone that a model can be geometrically innocent and practically impossible. The cure was not more clash detection. It was a better vocabulary and the habit of asking, for every important item: what space does this need, and what has to happen before and after it?
Hard, clearance and workflow clashes are three different questions: Does it collide? Does it have the space it needs? Can it be built and maintained in sequence? Test for each, own each, rank by consequence and report them separately. The word “soft” can help, if you tell people what you mean by it.
Where to go next: for the tests, read BIM Clash Detection: The Complete Guide. For designing them, continue with How to Create a BIM Clash Detection Matrix, and for the 4D side, 4D BIM Explained: Construction Scheduling and Simulation.