BIM Model Handover Checklist and Requirements
BIM model handover checklist and requirements: what is handed over, specifying requirements, a five-phase checklist, sampling with a worked example and acceptance criteria.
BIM model handover checklist and requirements: what is handed over, specifying requirements, a five-phase checklist, sampling with a worked example and acceptance criteria.
COBie explained: what it is and is not, the table families, version 3 changes, formats, how data are created, sensible specification, validation and use after handover.
BIM for bridges: model organization, foundations to deck, bearings and joints, design and analysis, construction use, inspection and condition data and asset handover.
BIM for roads and highways: existing conditions, alignment and profile, assemblies and corridors, drainage, earthworks, utilities, machine control and asset information.
BIM for subcontractors: reading requirements, building a lean capability, workflow from tender to handover, deliverables, coordination, pricing and supporting the supply chain.
BIM for as-built documentation and project handover: terminology, planning, capturing changes, verification, updating models, asset data, deliverables and acceptance.
BIM for MEP engineers: workflows by stage, linking calculations and models, ten best practices, working with the team, analysis uses and running an MEP office.
MEP systems classification and asset data: hierarchy, classification schemes, tag design, required data by criticality, COBie and IFC, data flow and verification.